$177.3M MUSIC HALL: THE ELECTRICIAN

Who's building the $177.3 million Music Hall at Chicago's 1901 Project

By Porter Stanley. Updated .

The Music Hall is a 6,000-capacity venue in Phase 1 of The 1901 Project, the Bulls and Blackhawks owners' $7 billion plan around the United Center in Chicago. The City issued its full building permit on Oct. 28, 2026, with a reported cost of $177.3 million. James McHugh Construction is the general contractor. The permit also lists JMS Electric, Warren Thomas Plumbing, Edwards Engineering and McHugh Concrete. We found no public bid date, so the way in is McHugh's prequalification and the firms on the permit.

$177.3MReported permit cost
6,000Guests
$7BWhole 1901 Project plan
21Opportunities listed

Get all 21 jobs and who to call

Each one with who's on the record and the date. Free: your email sets up your free account.

We send the list to this address, so use one you check. We never share it.

Get all 21 jobs and who to call

Each one with who's on the record and the date. Free: your email sets up your free account.

We send the list to this address, so use one you check. We never share it.

What are all the opportunities on the 1901 Project Music Hall?

We list 21 on the Music Hall and the rest of Phase 1: 11 name a firm or door on the record, 9 are planned with no date, and none has a public bid date.

1Latest recordOct 28, 2026

JMS Electric

Electrical contractor listed on the Music Hall's full permit and the West Garage's $50 million permit

On the Music Hall

Work: Electrical

Who to call: JMS Electric
(847) 352-3070

The opportunity: The firm's own website lists United Center renovations since 2009 and both teams' practice facilities. The permit doesn't show the contract value, what's already bought, or who supplies it.

2Latest recordNov 4, 2026

James McHugh Construction

McHugh's prequalification, required before bidding on any McHugh job

On the Music Hall

Work: All trades, suppliers

Who to call: James McHugh Construction
(312) 986-8000

The opportunity: McHugh's risk manager must approve a firm first. Its public plan room listed 6 jobs on Nov. 4, and none is this one. Private invitations wouldn't show there.

3Latest recordOct 28, 2026

Edwards Engineering

HVAC contractor listed for ventilation and refrigeration on the Music Hall's full permit and the West Garage's $50 million permit

On the Music Hall

Work: HVAC, sheet metal, piping

Who to call: Edwards Engineering
(847) 364-8100

The opportunity: The firm says it fabricates pipe and sheet metal in its own 52,000-square-foot shop. The permit doesn't show the contract value, what's already bought, or who supplies it.

What's the way in to the Music Hall at The 1901 Project in Chicago?

The way in to the Music Hall at The 1901 Project is through private firms, because the owner is private. We found no public bid date for the building.

James McHugh Construction is the general contractor on the City's permit. McHugh requires its prequalification before a firm can bid on any McHugh job, and its risk manager must approve the firm. McHugh's public plan room listed 6 jobs on Nov. 4, 2026, and none is this one.

UJAMAA Construction calls McHugh its joint venture partner on The 1901 Project. Ujamaa has a Trade Partners form and its own plan room. The City permit doesn't list Ujamaa, and its page doesn't mention this job.

The City permit also names 4 trade firms. A supplier can call those firms directly, because each one buys for its own scope. The permit doesn't show what they've already bought.

  • JMS Electric: Electrical, (847) 352-3070.
  • Edwards Engineering: Ventilation and refrigeration, (847) 364-8100.
  • Warren Thomas Plumbing: Plumbing, Bolingbrook.
  • McHugh Concrete Construction: concrete, Homer Glen.
  • The owner's goals are 30% MBE and 8% WBE, and the owner says it will use union labor.

What's being bought for the Music Hall at The 1901 Project in Chicago?

The City's full permit for the Music Hall reports $177.3 million. The permit describes a 2-story building with a mezzanine, no basement and Type I-B construction. An earlier permit calls it a 6,000-seat music venue with retail, storage, commercial loading, community space and an occupied roof.

The City issued a $2.7 million caisson permit on June 2, 2026, and a $5 million foundation and superstructure permit on July 21, 2026. The full permit followed on Oct. 28, 2026. We found no public date for any remaining package.

The rest of Phase 1 is separate from the Music Hall permit. The City says Phase 1 is $500 million in all. The West Garage has its own $50 million permit, and we found no permit for the hotel.

  • Facade: A one-story brick podium, a scalloped form and glass.
  • Roof: An occupied roof, with a green roof reported.
  • Room: 3 viewing levels for up to 6,000 guests, with acoustics and production capability.
  • Guest spaces: Bars, merchandise locations and premium hospitality.
  • Community room: About 3,000 square feet with technology, in a January 2025 owner document.
  • West Garage: 266 parking spaces and 10 loading spaces, with the rooftop park removed on Sept. 29, 2026.
  • Phase 1 hotel and retail: 180 keys and 80,000 square feet, by the owner's count.

How do the ways into the 1901 Project Music Hall compare?

Way inWhat it isBest forWhat you getThe limit
McHugh's prequalificationAn approval from McHugh's risk managerTrades and suppliers ready to bidEligibility to bid McHugh workIt covers McHugh generally, and its public plan room doesn't list this job
Selling to a firm on the permitA call to JMS Electric or Edwards EngineeringSuppliers and specialty subsA direct conversation with a firm the City namesThe permit doesn't show what they've bought, and neither publishes a supplier page
Ujamaa's Trade Partners formAn online qualification formTrades, including union and MBE or WBE firmsA place in Ujamaa's subcontractor databaseThe City permit doesn't list Ujamaa, and the page doesn't mention this job
The construction managerA call to Cullen Construction ManagementFirms that want the owner's side of the jobA conversation with the firm trade press namesIt isn't shown buying material or awarding trades
The owner's contact formA form with an M/WBE Opportunity subjectM/WBE firms and business partnersA message to the project teamIt isn't a vendor registration, and we found nothing on who reads it

Who should go after the 1901 Project Music Hall, and who shouldn't?

Electrical suppliersJMS Electric is listed on the Music Hall and West Garage permits.
HVAC, sheet metal and pipe suppliersEdwards Engineering is listed for ventilation and refrigeration, and it runs its own fabrication shop.
Trade contractors with no firm named yetStart with McHugh's prequalification, because we found no named firm for steel, glazing, roofing or elevators.
Firms that need a public bid dateThis isn't the job for you yet, because we found none.

What should you do next on the 1901 Project Music Hall?

  1. Start McHugh's prequalification if you're ready to bid McHugh work.
  2. Call the firm on the permit for your trade.
  3. Fill out Ujamaa's Trade Partners form if your firm fits it.
  4. See the full list for the firms and scopes on Phase 1.

Questions people ask about The 1901 Project in Chicago

What is The 1901 Project in Chicago?

The 1901 Project is a $7 billion plan for about 55 acres around the United Center in Chicago. The Reinsdorf and Wirtz families lead it through United Center Joint Venture. Those families own the Bulls and the Blackhawks.

Who is building the Music Hall at The 1901 Project?

James McHugh Construction is the general contractor on the City's permit. Trade press also calls McHugh the first-phase general contractor and lists Cullen Construction Management as construction manager.

Who is the general contractor on The 1901 Project in Chicago?

McHugh is the first-phase general contractor. UJAMAA Construction calls McHugh its joint venture partner, and one report names GMA Construction Group on the West Garage. The City permit lists neither firm, and we found no source on how the work is split.

How much does the 1901 Project Music Hall cost?

The City's full permit reports $177.3 million. Earlier permits for this building report $2.7 million and $5 million, and we found no source on whether $177.3 million includes them. Phase 1 is $500 million, and the whole plan is $7 billion.

Which subcontractors are on the 1901 Project Music Hall?

The full permit lists JMS Electric for electrical, Warren Thomas Plumbing for plumbing, Edwards Engineering for ventilation and refrigeration, and McHugh Concrete Construction. We found no named firm for steel, glazing, roofing or elevators.

How do subcontractors get on The 1901 Project?

McHugh requires its prequalification before a firm can bid on any McHugh job. Ujamaa has its own Trade Partners form. Neither page mentions this job, and neither guarantees an invitation.

When is the 1901 Project Music Hall bidding?

We found no public bid date. McHugh's public plan room listed 6 jobs on Nov. 4, 2026, and none is this one. Private invitations wouldn't show there.

Does The 1901 Project use union labor and MBE or WBE goals?

The owner says it will use union labor. Its goals are 30% minority-owned and 8% women-owned business participation. It also says community hires will be built into subcontractor agreements.

Where is the United Center music hall, and when is it opening?

The City's permit puts the Music Hall at 1904 W Adams St in Chicago, at Damen Avenue and Adams Street. The owner gives 2028 as its opening year.

What's in the first phase of the United Center development?

The City says Phase 1 includes a 6,000-seat music hall, retail and restaurant space, a hotel, parking garages and green space. The owner counts 180 hotel keys and 80,000 square feet of retail.

What are the risks of chasing the 1901 Project Music Hall?

We found no public bid date, and the packages are private. Electrical, plumbing and HVAC firms are already listed on the permit. Some scopes may already be bought, and public records don't show that.

What happens after a firm applies for McHugh's prequalification?

McHugh's risk manager must approve the firm before it can bid. McHugh's page gives no timeline, and approval doesn't promise an invitation to this job.

How we built this list

We read every City building permit at 1904 W Adams St and 1901 W Madison St, City street permits around the site, the owner's documents, the builders' own pages and trade press. A row is on the list only if a source ties it to the Music Hall, the West Garage or Phase 1. We left out arena tents and rooftop work, hiring pages and nearby jobs with no stated tie, and we mark each row by how firm it is. A row with no bid date is never marked as biddable. First published Nov. 4, 2026. We'll update this page when a new permit, firm or bid date appears.

Porter Stanley

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.

More project reports

All project reports
Get all 21 jobs, free

All 21 opportunities on the 1901 Project Music Hall

Enter your email and we will send it to you.

We send the list to this address, so use one you check. We never share it.