The way in to the Music Hall at The 1901 Project is through private firms, because the owner is private. We found no public bid date for the building.
James McHugh Construction is the general contractor on the City's permit. McHugh requires its prequalification before a firm can bid on any McHugh job, and its risk manager must approve the firm. McHugh's public plan room listed 6 jobs on Nov. 4, 2026, and none is this one.
UJAMAA Construction calls McHugh its joint venture partner on The 1901 Project. Ujamaa has a Trade Partners form and its own plan room. The City permit doesn't list Ujamaa, and its page doesn't mention this job.
The City permit also names 4 trade firms. A supplier can call those firms directly, because each one buys for its own scope. The permit doesn't show what they've already bought.
- JMS Electric: Electrical, (847) 352-3070.
- Edwards Engineering: Ventilation and refrigeration, (847) 364-8100.
- Warren Thomas Plumbing: Plumbing, Bolingbrook.
- McHugh Concrete Construction: concrete, Homer Glen.
- The owner's goals are 30% MBE and 8% WBE, and the owner says it will use union labor.
What's being bought for the Music Hall at The 1901 Project in Chicago?
The City's full permit for the Music Hall reports $177.3 million. The permit describes a 2-story building with a mezzanine, no basement and Type I-B construction. An earlier permit calls it a 6,000-seat music venue with retail, storage, commercial loading, community space and an occupied roof.
The City issued a $2.7 million caisson permit on June 2, 2026, and a $5 million foundation and superstructure permit on July 21, 2026. The full permit followed on Oct. 28, 2026. We found no public date for any remaining package.
The rest of Phase 1 is separate from the Music Hall permit. The City says Phase 1 is $500 million in all. The West Garage has its own $50 million permit, and we found no permit for the hotel.
- Facade: A one-story brick podium, a scalloped form and glass.
- Roof: An occupied roof, with a green roof reported.
- Room: 3 viewing levels for up to 6,000 guests, with acoustics and production capability.
- Guest spaces: Bars, merchandise locations and premium hospitality.
- Community room: About 3,000 square feet with technology, in a January 2025 owner document.
- West Garage: 266 parking spaces and 10 loading spaces, with the rooftop park removed on Sept. 29, 2026.
- Phase 1 hotel and retail: 180 keys and 80,000 square feet, by the owner's count.
How do the ways into the 1901 Project Music Hall compare?
| Way in | What it is | Best for | What you get | The limit |
|---|
| McHugh's prequalification | An approval from McHugh's risk manager | Trades and suppliers ready to bid | Eligibility to bid McHugh work | It covers McHugh generally, and its public plan room doesn't list this job |
| Selling to a firm on the permit | A call to JMS Electric or Edwards Engineering | Suppliers and specialty subs | A direct conversation with a firm the City names | The permit doesn't show what they've bought, and neither publishes a supplier page |
| Ujamaa's Trade Partners form | An online qualification form | Trades, including union and MBE or WBE firms | A place in Ujamaa's subcontractor database | The City permit doesn't list Ujamaa, and the page doesn't mention this job |
| The construction manager | A call to Cullen Construction Management | Firms that want the owner's side of the job | A conversation with the firm trade press names | It isn't shown buying material or awarding trades |
| The owner's contact form | A form with an M/WBE Opportunity subject | M/WBE firms and business partners | A message to the project team | It isn't a vendor registration, and we found nothing on who reads it |
Who should go after the 1901 Project Music Hall, and who shouldn't?
| Electrical suppliers | JMS Electric is listed on the Music Hall and West Garage permits. |
|---|
| HVAC, sheet metal and pipe suppliers | Edwards Engineering is listed for ventilation and refrigeration, and it runs its own fabrication shop. |
|---|
| Trade contractors with no firm named yet | Start with McHugh's prequalification, because we found no named firm for steel, glazing, roofing or elevators. |
|---|
| Firms that need a public bid date | This isn't the job for you yet, because we found none. |
|---|
What should you do next on the 1901 Project Music Hall?
- Start McHugh's prequalification if you're ready to bid McHugh work.
- Call the firm on the permit for your trade.
- Fill out Ujamaa's Trade Partners form if your firm fits it.
- See the full list for the firms and scopes on Phase 1.
Questions people ask about The 1901 Project in Chicago
What is The 1901 Project in Chicago?
The 1901 Project is a $7 billion plan for about 55 acres around the United Center in Chicago. The Reinsdorf and Wirtz families lead it through United Center Joint Venture. Those families own the Bulls and the Blackhawks.
Who is building the Music Hall at The 1901 Project?
James McHugh Construction is the general contractor on the City's permit. Trade press also calls McHugh the first-phase general contractor and lists Cullen Construction Management as construction manager.
Who is the general contractor on The 1901 Project in Chicago?
McHugh is the first-phase general contractor. UJAMAA Construction calls McHugh its joint venture partner, and one report names GMA Construction Group on the West Garage. The City permit lists neither firm, and we found no source on how the work is split.
How much does the 1901 Project Music Hall cost?
The City's full permit reports $177.3 million. Earlier permits for this building report $2.7 million and $5 million, and we found no source on whether $177.3 million includes them. Phase 1 is $500 million, and the whole plan is $7 billion.
Which subcontractors are on the 1901 Project Music Hall?
The full permit lists JMS Electric for electrical, Warren Thomas Plumbing for plumbing, Edwards Engineering for ventilation and refrigeration, and McHugh Concrete Construction. We found no named firm for steel, glazing, roofing or elevators.
How do subcontractors get on The 1901 Project?
McHugh requires its prequalification before a firm can bid on any McHugh job. Ujamaa has its own Trade Partners form. Neither page mentions this job, and neither guarantees an invitation.
When is the 1901 Project Music Hall bidding?
We found no public bid date. McHugh's public plan room listed 6 jobs on Nov. 4, 2026, and none is this one. Private invitations wouldn't show there.
Does The 1901 Project use union labor and MBE or WBE goals?
The owner says it will use union labor. Its goals are 30% minority-owned and 8% women-owned business participation. It also says community hires will be built into subcontractor agreements.
Where is the United Center music hall, and when is it opening?
The City's permit puts the Music Hall at 1904 W Adams St in Chicago, at Damen Avenue and Adams Street. The owner gives 2028 as its opening year.
What's in the first phase of the United Center development?
The City says Phase 1 includes a 6,000-seat music hall, retail and restaurant space, a hotel, parking garages and green space. The owner counts 180 hotel keys and 80,000 square feet of retail.
What are the risks of chasing the 1901 Project Music Hall?
We found no public bid date, and the packages are private. Electrical, plumbing and HVAC firms are already listed on the permit. Some scopes may already be bought, and public records don't show that.
What happens after a firm applies for McHugh's prequalification?
McHugh's risk manager must approve the firm before it can bid. McHugh's page gives no timeline, and approval doesn't promise an invitation to this job.
How we built this list
We read every City building permit at 1904 W Adams St and 1901 W Madison St, City street permits around the site, the owner's documents, the builders' own pages and trade press. A row is on the list only if a source ties it to the Music Hall, the West Garage or Phase 1. We left out arena tents and rooftop work, hiring pages and nearby jobs with no stated tie, and we mark each row by how firm it is. A row with no bid date is never marked as biddable. First published Nov. 4, 2026. We'll update this page when a new permit, firm or bid date appears.

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.
Sources, checked Nov. 4, 2026- City of Chicago building permits, 101084976, 101077786, 101074704, 101075068, 101082925
- City of Chicago transportation permits, DOT2300214, DOT2283178
- City of Chicago release, May 20, 2026
- The 1901 Project, homepage
- The 1901 Project, Music Hall
- The 1901 Project, Brand Guidelines Package
- The 1901 Project, Neighborhood Partnership Commitments
- McHugh Construction, Partner With Us
- McHugh Construction, Public Plan Room
- UJAMAA Construction, Trade Partners
- UJAMAA Construction release, June 11, 2026
- JMS Electric, Sports Arenas and Cultural Attractions
- Edwards Engineering
- Taylor Excavating & Construction
- Cullen Construction Management
- GMA Construction Group
- Theatre Projects
- ENR Midwest, June 29, 2026
- Urbanize Chicago, Nov. 3, 2026
- Urbanize Chicago, July 28, 2026
- Chicago YIMBY, May 12, 2026
- Chicago YIMBY, June 4, 2026
- Chicago Cityscape, June 2026
- Pollstar, Sept. 24, 2026
- Release on Archinect, June 2026
- New London Architecture, updated May 16, 2025