Who's building Kalamazoo's Greenleaf Trust Center

Kalamazoo's $515 million arena got its name, Greenleaf Trust Center, on Nov. 20, and it is about 65% built.

By Porter Stanley. Updated .

Kalamazoo's new downtown arena was named the Greenleaf Trust Center on Nov. 20, 2026. It costs $515 million, is privately funded and is about 65% complete. It opens in October 2027 as the home of Western Michigan University basketball and hockey and the Kalamazoo Wings. The plan was $300 million in 2023. On building cost alone, no other Kalamazoo building seems to match it. Barton Malow and CSM Group are building it as a joint venture. 10 firms are named on the job; the list below has all 10.

$515MConstruction cost, privately funded
65%Complete as of Nov. 20, 2026
Oct. 2027Opening for WMU and the K-Wings
10Firms named on the job

Get all 10 firms and who to call

Each one with what it does on the job and its main office line. Free: your email sets up your free account.

We send the list to this address, so use one you check. We never share it.

Get all 10 firms and who to call

Each one with what it does on the job and its main office line. Free: your email sets up your free account.

We send the list to this address, so use one you check. We never share it.

Who are the 10 firms on the Greenleaf Trust Center?

We list the 10 firms named on the Greenleaf Trust Center in Kalamazoo, one row each, strongest tie first, with what each one does on the job and where its name comes from.

1Latest recordNov 25, 2026

Barton Malow

Construction manager in a joint venture with CSM Group; its ironworkers erected the arena's structural steel on the Greenleaf Trust Center arena in downtown Kalamazoo, MI

Greenleaf Trust Center (formerly the Kalamazoo Event Center), 411 W. Kalamazoo Ave., Kalamazoo (Kalamazoo County), MI

Construction manager at risk on a $515 million build (joint venture with CSM Group; the contract value is not published); about 6,000 tons of structural steel

Work: Construction manager in a joint venture with CSM Group; its ironworkers erected the arena's structural steel

Who to call: Barton Malow
Barton Malow main line
(Southfield, MI)
(248) 436-5000

The opportunity: Barton Malow's project page: 'Barton Malow is overseeing the construction management with JV partner, CSM Group.' Barton Malow ironworkers set the final 33-foot steel beam at the topping out on April 24, 2026. The State of Michigan's July 29, 2025 safety partnership release names the job 'Kalamazoo Event Center (CSM Group and Barton Malow).' The phone is the main line on Barton Malow's own contact page, and the same line is on the city's site plan set for the construction manager.

2Latest recordNov 25, 2026

CSM Group

Construction manager at risk, directly awarded the job; Kalamazoo-based partner in the joint venture with Barton Malow on the Greenleaf Trust Center arena in downtown Kalamazoo, MI

Greenleaf Trust Center (formerly the Kalamazoo Event Center), 411 W. Kalamazoo Ave., Kalamazoo (Kalamazoo County), MI

Construction manager at risk on a $515 million, 453,000 sq ft build (joint venture with Barton Malow; the contract value is not published)

Work: Construction manager at risk, directly awarded the job; Kalamazoo-based partner in the joint venture with Barton Malow

Who to call: CSM Group
CSM Group main line
(Kalamazoo, MI)
(877) 386-8214

The opportunity: CSM Group's project page: 'CSM Group was directly awarded the project based on a foundation of trust and proven delivery performance.' CSM also managed Catalyst Development's last big downtown Kalamazoo tower.

3Named in the newsJun 2, 2026

TWC Concrete Services (the record says only "TWC")

Concrete contractor that poured the arena's concrete through the 2025-26 winter on the Greenleaf Trust Center arena in downtown Kalamazoo, MI

Greenleaf Trust Center (formerly the Kalamazoo Event Center), 411 W. Kalamazoo Ave., Kalamazoo (Kalamazoo County), MI

Work: Concrete contractor that poured the arena's concrete through the 2025-26 winter

Who to call: TWC Concrete Services (the record says only "TWC")
TWC Concrete Services office line
(Bellevue, MI)
(269) 371-0671

The opportunity: A June 2, 2026 trade press report, quoting Barton Malow's senior project manager: 'Barton Malow erected steel, and TWC poured concrete throughout the winter months.' The record says only 'TWC'. We matched it to TWC Concrete Services by name only; its Bellevue, MI office is about 30 miles from the site. No record we found states the full name.

What is being built in downtown Kalamazoo?

The Greenleaf Trust Center is a new arena and event center at 411 W. Kalamazoo Ave. in downtown Kalamazoo, Michigan. Until Nov. 20, 2026 it was called the Kalamazoo Event Center. It will be the home of Western Michigan University basketball and Bronco hockey and the Kalamazoo Wings.

The building is 453,000 sq ft. It holds one main arena with 5,500 to 6,750 seats, a 20,000 sq ft event hall, two practice courts, a practice sheet of ice and an athletic performance center for college and pro teams. A separate parking deck is built from 1,516 precast pieces.

How much does the Greenleaf Trust Center cost?

The construction cost is $515 million, and the building is privately funded. When Kalamazoo County sold the land in 2023, for about $4.2 million, the plan was a $300 million arena of up to 320,000 sq ft. The sale closed after four county commissioners dropped a roadblock they had set.

On building cost alone, no other Kalamazoo building seems to match it. The closest found, Bronson Methodist Hospital, cost over $340 million in today's dollars. Separately, the city and CD Arena, LLC are splitting a $13 million package of utility and Arcadia Creek work roughly in half, in contracts that went to a city commission vote in June 2025.

How far along is the Greenleaf Trust Center?

The building was about 65% complete on Nov. 20, 2026, when Greenleaf Companies chairman William D. Johnston revealed the new name. Greenleaf Trust bought 10-year naming rights. The doors open in October 2027.

Crews broke ground on Sept. 26, 2025 and moved about 77,000 cubic yards of dirt. In February 2026, nearly 190 tradespeople worked on site each day. On April 24, 2026, ironworkers set the final 33-foot steel beam. By Aug. 26, nearly 500 of about 1,100 glass sections were in. In its Oct. 22 update, the owner said a helicopter had lifted mechanical equipment onto the roof and crews were pouring concrete aisle steps on the precast seating structure. The ice floor concrete and the scoreboard go in early in 2027.

Who is building the Greenleaf Trust Center?

Barton Malow and CSM Group are the construction managers, as a joint venture. CSM Group, based in Kalamazoo, says it was directly awarded the job. Barton Malow erected about 6,000 tons of structural steel. Rockford Construction is the owner's representative for the developer, Catalyst Development.

TowerPinkster is the architect, with design partner HOK + ROSSETTI. Hurley & Stewart drew the survey, grading, utility and stormwater sheets in the city's site plan set. Crown Corr is on the building's skin: about 80,000 sq ft of curtain wall and 70,000 sq ft of insulated metal panels. A June 2026 report says "TWC" poured concrete through the winter. Consumers Energy works with the city on the gas and electric upgrades. 10 firms in all are on the list below.

Which trades are still not named on the Greenleaf Trust Center?

No public record we found names the electrical, mechanical, plumbing, fire protection, steel fabricator, precast or ice plant firms. We found no published list of who won the trade packages. The city's site plan cover shows the structural engineer and the ice, technology, lighting and food service consultants only as logos, so we left them off the list.

For those trades, the way in is the construction managers, Barton Malow and CSM Group, who hold the job's subcontracts.

Who Catalyst Development hired before

Catalyst Development's last big downtown Kalamazoo build, its $70 million, seven-story mixed-use building (under construction in 2019), used the same construction manager and architect it hired for the arena.

  • CSM Group: builder on Catalyst Development's 290,000 sq ft mixed-use building in downtown Kalamazoo, Kalamazoo, MI, 2019. Also on this job.
  • TowerPinkster: architect on Catalyst Development's $70M seven-story mixed-use building, Kalamazoo, MI, 2019. Also on this job.
  • WGI: engineer (parking functional and structural design) on Catalyst Development's $70M seven-story mixed-use building, Kalamazoo, MI, 2019.
  • R.W. LaPine: plumbing and piping on the Catalyst Development mixed-use building, Kalamazoo, MI, 2019.
  • Moore Electric: electrical on the Catalyst Development mixed-use building, Kalamazoo, MI, 2019.

These are earlier or other jobs for the same owner. They are not counted in the 10 firms on this job.

How do the ways into the Greenleaf Trust Center compare?

Way inWhat it isBest forWhat you getThe limit
The firms on the jobA call to the firm's office, asking for the team on the Greenleaf Trust Center in KalamazooEvery supplier, distributor and sales repA conversation with a firm already working on the jobStart with the firms whose trade matches what you sell
The construction managersA call to Barton Malow or CSM Group about the trades not yet namedElectrical, mechanical, plumbing, fire and ice plant firms and their suppliersA place on a $515 million arena that opens in October 2027No public award list; with the building about 65% complete, many packages may already be let

Who should go after the Greenleaf Trust Center?

Steel, concrete and building skin suppliersBarton Malow on about 6,000 tons of structural steel, a firm the record names only as "TWC" on concrete, and Crown Corr on 80,000 sq ft of curtain wall and 70,000 sq ft of metal panels.
Electrical, mechanical and ice plant repsNo firm is named yet in these trades, so the way in is the construction managers, Barton Malow and CSM Group, with the arena about 65% built.
Engineering, survey and utility firmsTowerPinkster, HOK + ROSSETTI and Hurley & Stewart on design, Rockford for the owner, and Consumers Energy on the gas and electric upgrades.

What should you do next on the Greenleaf Trust Center?

  1. Pick the firms whose work matches what you sell, and call them this week.
  2. Ask for the team on the Greenleaf Trust Center (the Kalamazoo Event Center) at 411 W. Kalamazoo Ave.
  3. For trades not yet named, call Barton Malow and CSM Group before the 2027 ice floor and scoreboard work.

Questions people ask about the Greenleaf Trust Center

How much does the Greenleaf Trust Center cost?

$515 million, privately funded. In 2023 the plan was a $300 million arena of up to 320,000 sq ft. On building cost alone, no other Kalamazoo building seems to match it.

Who is building the Greenleaf Trust Center?

Barton Malow and CSM Group, as construction managers in a joint venture. TowerPinkster is the architect, with design partner HOK + ROSSETTI. 10 firms are named on the job, listed above.

When does the Greenleaf Trust Center open?

October 2027. It was about 65% complete on Nov. 20, 2026.

Who will play at the Greenleaf Trust Center?

Western Michigan University basketball and Bronco hockey and the Kalamazoo Wings. It will also host concerts and events.

Was the Greenleaf Trust Center the Kalamazoo Event Center?

Yes. On Nov. 20, 2026, Greenleaf Trust bought 10-year naming rights, and the Kalamazoo Event Center became the Greenleaf Trust Center.

Where is the Greenleaf Trust Center?

At 411 W. Kalamazoo Ave. in downtown Kalamazoo, Kalamazoo County, Michigan.

How big is the Greenleaf Trust Center?

453,000 sq ft, with 5,500 to 6,750 seats, a 20,000 sq ft event hall, two practice courts, a practice sheet of ice and a separate precast parking deck.

Is the Greenleaf Trust Center the most expensive building in Kalamazoo?

Very likely, on building cost alone. A March 2026 look at the city's history found no other Kalamazoo building that seems to match its $515 million price. The closest was Bronson Methodist Hospital, at over $340 million in today's dollars.

Who owns the Greenleaf Trust Center?

CD Arena, LLC, part of Catalyst Development Co. and the Greenleaf companies. Greenleaf Hospitality Group will run it. Rockford Construction is the owner's representative.

How can subcontractors get on the Greenleaf Trust Center?

Call the construction managers, Barton Malow and CSM Group, who hold the subcontracts. No public record names the electrical, mechanical, plumbing or ice plant firms yet.

What happens next on the Greenleaf Trust Center?

The ice floor concrete and the scoreboard go in early in 2027, sunshades in spring 2027, and the doors open in October 2027. We'll update this page when a new firm appears.

How we built this list

We read the owner's naming announcement and its project updates, the project pages of CSM Group, Barton Malow, Crown Corr and Rockford, the City of Kalamazoo's site plan review set (received Sept. 11, 2024), the State of Michigan's July 2025 safety partnership release, and news reports, all on Nov. 25, 2026. We kept each firm a public record names on this job. One is matched by name only: the record says "TWC", and we matched it to TWC Concrete Services. Left out: the owner, developer and operator, the naming-rights bank, a law firm, public and nonprofit partners, a photo credit, a 2021 feasibility study firm, and the structural engineer and the ice, technology, lighting and food service consultants, which the site plan shows only as logos. We found no city building permits for the address. Contract values for the construction managers are not published. Phones are each firm's own line from its own site, except Rossetti's, which is the line printed on the city's site plan for its Detroit office; HOK shows no main line we could verify. First published Nov. 25, 2026. We'll update this page when a new contract, filing or firm appears.

Porter Stanley

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.

Sources, checked Nov. 25, 2026
  1. DBusiness: $515M Greenleaf Trust Center to open in Kalamazoo in fall 2027 (Nov. 24, 2026)
  2. Greenleaf Trust Center: naming announcement (Nov. 20, 2026)
  3. FOX 17: Kalamazoo Event Center officially named Greenleaf Trust Center (Nov. 20, 2026)
  4. Greenleaf Trust Center: October 2026 update
  5. Greenleaf Trust Center: August 2026 update, closing it in
  6. Greenleaf Trust Center: topping out (April 24, 2026)
  7. Greenleaf Trust Center: February 2026 update
  8. Construction Equipment Guide: $515M Kalamazoo Event Center rises (June 2, 2026)
  9. WMUK: Will the Kalamazoo Event Center be the most expensive building in Kalamazoo? (March 13, 2026)
  10. FOX 17: Kalamazoo County signs on the dotted line for $300M event center property (2023)
  11. Western Michigan University: Athletic Performance Center groundbreaking (Oct. 2, 2025)
  12. CSM Group: Kalamazoo Event Center project page (read Nov. 25, 2026)
  13. Barton Malow: Kalamazoo Event Center project page (read Nov. 25, 2026)
  14. Crown Corr: Kalamazoo Event Center DA project page (read Nov. 25, 2026)
  15. Rockford Construction: Kalamazoo Event Center project page (read Nov. 25, 2026)
  16. Second Wave Media: Northside residents eye inclusion as Kalamazoo Event Center takes shape (Sept. 24, 2025)
  17. State of Michigan LEO: construction safety partnerships (July 29, 2025)
  18. City of Kalamazoo: 411 W. Kalamazoo Ave. site plan review set (received Sept. 11, 2024)
  19. WKZO: City commission to vote on $13 million utility and Arcadia Creek contracts (June 16, 2025)
  20. WWMT: Four commissioners' roadblock clears; county sells land for $300M event center (April 6, 2023)
  21. Michigan Building and Construction Trades Council: 'A lot to like' about major new development in Kalamazoo
  22. WGI: Construction Update: Catalyst Mixed-Use - Kalamazoo, MI (2019-07-09)

More project reports

All project reports
Get all 10 firms, free

All 10 firms on the Greenleaf Trust Center

Enter your email and we will send it to you.

We send the list to this address, so use one you check. We never share it.