What is Amazon building in Chantilly, Virginia?
Amazon Web Services is building a data center called IAD159 at 25374 Meadowdale Drive in Chantilly, in Loudoun County. The county's permits show one shell of 253,714 sq ft, fit out in 12 phases, each with two power blocks. The owner on the permits is Amazon Data Services, Inc.
IAD159 sits on Amazon's 100-acre campus at Willard Road and Tall Cedars Parkway, off Route 50. Amazon bought the land in 2019 for $73 million. Two more Amazon buildings on the campus, at 25410 and 25190 Meadowdale Drive, have their own 2026 permits.
How much is the Amazon Chantilly data center?
Amazon has given no cost for IAD159. Loudoun County values the shell at $23,360,286 on its building permit. Each of the 11 issued fit-out permits lists an estimated cost of $835,000. Together that is about $32.5 million, the sum. The trade permits list no dollar value.
A county permit value is what was declared to the county for that work, not Amazon's spend. Amazon said in 2023 it plans to invest $35 billion in Virginia by 2040, but that is for the whole state, not this building.
How much power will IAD159 have?
IAD159's electrical permits list 24 power blocks. Each one has an outdoor 2,800 kVA transformer, a 2,750 kW generator and a 4,000 A switchboard. 24 generators of 2,750 kW is about 66 MW of backup power for one building, the math. Loudoun issued 19 of the block permits on Oct. 23, 2026, and the other 5 are waiting on fees. A smaller office block has its own 750 kW generator.
The cooling is big too. The mechanical permits list 148 rooftop exhaust fans, 264 liquid cooling fan coil units and 88 liquid cooling pumping units across the 12 phases.
How far along is the Amazon Chantilly data center?
The shell permit was filed Dec. 26, 2025 and issued May 1, 2026. Eleven fit-out phases were issued May 11; phase 1 was cancelled. Mechanical permits followed from May 21 to Oct. 26, the underground fire line on Oct. 1, and 19 generator block permits on Oct. 23.
The newest issued permits are fire alarm permits for all 12 phases, issued Oct. 28 to Nov. 2, 2026. Cooper Steel filed for a site trailer on Oct. 6; it is paid for but not yet issued. No certificate of occupancy is on the record yet.
Who is building the Amazon Chantilly data center?
No IAD159 permit names a general contractor. Clark Construction has run the state stormwater permit for the whole 100-acre campus since July 23, 2025, set to run to Oct. 31, 2027. Clark also applied for a permit, later cancelled, at the building next door.
Bohler is the site civil engineer and files the permits for the shell, the fit-out and the trade work.
Which trade firms are on the Amazon Chantilly data center?
Power Solutions holds the 27 electrical permits for the power gear, including the 24 generator blocks. American Automatic Sprinkler and its fire alarm arm, American Fire Systems, hold the fire alarm and early smoke detection permits for every phase. Pro-Air holds the mechanical and plumbing permits.
B&S Site Development is the contractor for the underground fire line, and E.L. Blackwell Electric put in underground electrical conduit. Cooper Steel, a steel firm, filed for its trailer on the job. 8 firms in all are on the list below.
How do the ways into the Amazon Chantilly data center compare?
| Way in | What it is | Best for | What you get | The limit |
|---|
| The firms on the job | A call to the firm's office, asking for the team on Amazon's IAD159 data center | Every supplier, distributor and sales rep | A conversation with a firm already working on the job | Start with the firms whose trade matches what you sell |
Who should go after the Amazon Chantilly data center?
| Electrical distributors and gear reps | Power Solutions on 24 power blocks, each with a 2,750 kW generator, a 2,800 kVA transformer and a 4,000 A switchboard; E.L. Blackwell on underground conduit. |
|---|
| Mechanical, HVAC and cooling reps | Pro-Air on 148 rooftop exhaust fans, 264 liquid cooling fan coil units and 88 liquid cooling pumping units across 12 phases. |
|---|
| Fire, steel and site suppliers | American Automatic Sprinkler on fire alarm and smoke detection for every phase, B&S Site Development on the underground fire line, and Cooper Steel. |
|---|
What should you do next on the Amazon Chantilly data center?
- Pick the firms whose work matches what you sell, and call them this week.
- Ask for the team on Amazon's IAD159 data center at 25374 Meadowdale Drive in Chantilly.
Questions people ask about the Amazon Chantilly data center
How much is the Amazon Chantilly data center?
Amazon has given no cost. Loudoun County values the 253,714 sq ft IAD159 shell at $23,360,286 on its building permit. the sum of the building permits is about $32.5 million. A permit value is what was declared to the county, not Amazon's spend.
How much backup power will IAD159 have?
IAD159's permits list 24 power blocks, each with a 2,750 kW generator. That is about 66 MW of backup generators for one building, the math. Loudoun issued 19 of the block permits on Oct. 23, 2026.
Who is building the Amazon data center in Chantilly?
No IAD159 permit names a general contractor. Clark Construction runs the state stormwater permit for the whole campus. Power Solutions holds the electrical permits, Pro-Air the mechanical ones and American Automatic Sprinkler the fire alarm ones. 8 firms are on the list above.
Where is Amazon's IAD159 data center?
It is at 25374 Meadowdale Drive in Chantilly, in Loudoun County, Virginia, on Amazon's 100-acre campus at Willard Road and Tall Cedars Parkway, off Route 50.
What is IAD159?
IAD159 is Amazon Web Services' name for this data center building on Loudoun County's permits. It is a 253,714 sq ft shell with 12 fit-out phases.
How far along is the Amazon Chantilly data center?
The shell permit was issued May 1, 2026. 19 generator block permits came Oct. 23 and the fire alarm permits Oct. 28 to Nov. 2, 2026. No certificate of occupancy is on the record yet.
What is the newest permit on IAD159?
The fire alarm permits for all 12 phases, issued Oct. 28 to Nov. 2, 2026. Cooper Steel also filed for a site trailer on Oct. 6, 2026, not yet issued.
How much did Amazon pay for the Chantilly land?
Amazon bought the 100-acre site in 2019 for $73 million.
Is IAD159 the land Amazon bought on Hazel Park Court?
No. The Hazel Park Court land in the November news is a different site, in Fairfax County. IAD159 is on Amazon's 100-acre Loudoun County campus bought in 2019.
Does Amazon's $35 billion Virginia plan cover this building?
No. Amazon said in 2023 it plans to invest $35 billion by 2040 across Virginia. That is for the whole state, not this building.
What happens next on the Amazon Chantilly data center?
Cooper Steel's trailer permit and 5 generator block permits are waiting to be issued, and the building has no certificate of occupancy yet. We'll update this page when a new permit or firm appears.
How we built this list
We read Loudoun County's public permit records for 25374 Meadowdale Drive on Nov. 20, 2026, 141 cases with their contacts, along with Virginia's state construction stormwater records and news reports. We kept each firm a public record names on IAD159 or on the campus that holds it. Seven are named on IAD159's own permits or filings; Clark Construction is named on the campus's state stormwater permit, so we mark that tie as it is. The $32.5 million is the sum of the county's permit values, not Amazon's spend, and the 66 MW is the math from the 24 generator block permits, 19 of them issued. Record dates are each record's issue or filing date. Left out: the owner, a permit runner, an individual applicant, the land seller, the campus's earlier stormwater operator, the power company and a builder found on other Amazon sites nearby but not on this campus, because no record ties them to IAD159. Phones are each firm's own main or office line from its own site; American Automatic Sprinkler's site did not load for us, so its line is from business listings. Power Solutions, Pro-Air and Cooper Steel are head offices outside Virginia. First published Nov. 20, 2026. We'll update this page when a new permit, filing or firm appears.

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.