Google is building a data center campus at Elliot and Sossaman Roads in Mesa, Arizona, called Project Redhawk. The Mesa City Council approved a $1 billion development plan for it in July 2019. JE Dunn Construction is the general contractor, and the city's building permits on the campus add up to about $306.5 million, the sum of Mesa permit values. Building 1 got its certificate of occupancy on Aug. 8, 2025, and Building 2 on Sept. 29, 2026. Building 3's $78.4 million data hall permit, issued June 18, 2026, is the biggest on the campus. 15 firms are named on the job; the list below has all 15.
$1BCampus plan the Mesa City Council approved (2019)
$306.5MMesa building permits on the campus (the sum)
$78.4MBuilding 3 data hall permit (JE Dunn)
15Firms named on the job
Get all 15 firms and who to call
Each one with what it does on the job and its main office line. Free: your email sets up your free account.
Who are the 15 firms on Google's Mesa data center?
We list the 15 firms named on Google's Mesa data center campus, one row each, grouped by kind of firm, with where each name comes from.
1Permit on the recordAug 3, 2026
JE Dunn Construction
General contractor on the data center buildings: the first data center, the Phase 2 building and Building 3's foundations and 285,282 sq ft data hall, plus a new private substation on Google's data center campus at Elliot and Sossaman Roads in Mesa, AZ
Google's data center campus (Project Redhawk), 7232 E Elliot Rd at Elliot and Sossaman Roads, Mesa (Maricopa County), AZ
Building permit (Building 3 data hall), value $78,386,935, issued June 18, 2026; also the first data center, $72,652,759 (Nov. 9, 2023), Building 3 foundations, $36,751,322 (Feb. 9, 2026), and a private substation, $3,000,000 (Aug. 3, 2026)
Work: General contractor on the data center buildings: the first data center, the Phase 2 building and Building 3's foundations and 285,282 sq ft data hall, plus a new private substation
The opportunity: New ground up 285,282 SF unlimited area data hall building with type II-B construction. Project includes the installation of mechanical and electrical yards. (Contractor: JE Dunn Construction, Tempe.) JE Dunn also runs part of the job as 'J.E. Dunn - Haydon, a Joint Venture'.
2Permit on the recordApr 1, 2026
Haydon Building Corp (Haydon Companies)
Joint-venture partner with JE Dunn; Phase 1 smart cooling with two new water storage tanks and pump enclosures, and Phase 3 mass grading and drainage on Google's data center campus at Elliot and Sossaman Roads in Mesa, AZ
Google's data center campus (Project Redhawk), 7232 E Elliot Rd at Elliot and Sossaman Roads, Mesa (Maricopa County), AZ
Building permit (Phase 1 smart cooling), value $15,037,606, issued April 1, 2026; also Phase 3 mass grading and drainage, issued Sept. 11, 2025
Work: Joint-venture partner with JE Dunn; Phase 1 smart cooling with two new water storage tanks and pump enclosures, and Phase 3 mass grading and drainage
Who to call: Haydon Building Corp (Haydon Companies)
The opportunity: Phase 1 building smart cooling. Adding (2) new water storage tanks, (2) pump enclosures. (Contractor: Haydon Companies LLC.) Named as applicant 'J.E. Dunn - Haydon, a Joint Venture' on, issued April 15, 2025.
3Permit on the recordOct 29, 2025
Caliente Construction, Inc.
Builder of the RedHawk HUB, the one-story office support buildings on the campus, and the amenity pergola on Google's data center campus at Elliot and Sossaman Roads in Mesa, AZ
Google's data center campus (Project Redhawk), 7232 E Elliot Rd at Elliot and Sossaman Roads, Mesa (Maricopa County), AZ
Building permit (RedHawk HUB Phase 1, 11,638 sq ft), value $10,985,652, issued March 12, 2025; also HUB Phase 2, 10,470 sq ft, $2,040,371, issued Oct. 29, 2025
Work: Builder of the RedHawk HUB, the one-story office support buildings on the campus, and the amenity pergola
The opportunity: The RedHawk HUB is a one-story, office support building serving the RedHawk Data Center campus located at the intersection of Sossaman and Elliot Road. (Contractor: Caliente Construction, Inc.)
Google is building a data center campus at 7232 E Elliot Rd, at the northwest corner of Elliot and Sossaman Roads in Mesa. The campus is about 187 acres, and the project is called Project Redhawk. It has three data center buildings, two office support buildings called the RedHawk HUB, and on-site substations.
The Mesa City Council approved a $1 billion development plan for the campus in July 2019. That is a city-approved plan, not a construction bill. The city deal asks Google to spend at least $600 million by July 2025, $800 million by 2027 and $1 billion by 2029. Google announced a $600 million data center there when it broke ground in September 2023.
How far along is Google's Mesa data center?
Two buildings are done and a third is going up. The City of Mesa gave Building 1 its certificate of occupancy on Aug. 8, 2025, and Building 2 on Sept. 29, 2026.
Building 3 is under construction. The city issued its foundations permit on Feb. 9, 2026 and its 285,282 sq ft data hall permit on June 18, 2026. The newest record is a temporary traffic control permit at the site, issued Nov. 5, 2026. The newest building permits, issued Oct. 14, 2026, are for widening the site entrance and a fire alarm in a dining tent.
What is being bought on Google's Mesa data center campus?
The City of Mesa's building permits on the campus add up to about $306.5 million, the sum of Mesa permit values. The biggest are $78.4 million for Building 3's data hall, $72.7 million for the first data center, $36.8 million for Building 3's foundations, $30.8 million for earlier foundations and $27.5 million for the Phase 2 building. Building 3 alone is $115.1 million.
Other permits cover a $16.6 million build-out for equipment, $15.0 million of smart cooling with water tanks and pumps, $11.0 million for the first HUB office building and a $3 million private substation. Permit values cover building work only, not servers or most equipment.
Who is building Google's Mesa data center?
JE Dunn Construction is the general contractor on the data center buildings, from the first data center in 2023 to Building 3's data hall in 2026. It runs part of the job as a joint venture with Haydon Building Corp, which holds the smart cooling and Phase 3 grading permits.
Caliente Construction holds the permits for the RedHawk HUB office buildings. Teklus Construction holds the newest building permit, for the site entrance, a guard shack and a truck driver shelter. HDR Engineering is the engineer on the campus's water and sewer lines.
Which trade firms are on Google's Mesa data center?
For electrical, the permits name Faith Technologies for temporary power to the HUB, Dynalectric for medium-voltage temporary power on the first data center, and Cache Valley Electric and Amplified Wireless Solutions for emergency radio systems. Salt River Project, the power utility, pulled underground cable for the campus.
Climatec and Metro Fire Equipment handle fire alarms and kitchen fire suppression. Advantic Building Group built catwalks and stair towers for the generators, and FPS Civil built parking canopies. DLR Group was the applicant for the HUB office building. 15 firms in all are on the list below.
How do the ways into Google's Mesa data center compare?
Way in
What it is
Best for
What you get
The limit
The firms on the job
A call to the firm's office, asking for the team on Google's Mesa data center
Every supplier, distributor and sales rep
A conversation with a firm already working on the job
Start with the firms whose trade matches what you sell
Who should go after Google's Mesa data center?
Electrical distributors and gear reps
JE Dunn's $78.4 million Building 3 data hall with its electrical yards, plus Faith Technologies, Dynalectric and Cache Valley Electric.
Mechanical, cooling and water suppliers
Haydon's $15.0 million smart cooling job with water tanks and pumps, and Teklus' cooling for 47 generator enclosures.
Fire protection, steel and site suppliers
Climatec and Metro Fire Equipment on fire protection; Advantic's catwalks and stair towers and FPS Civil's parking canopies.
What should you do next on Google's Mesa data center?
Pick the firms whose work matches what you sell, and call them this week.
Ask for the team on Google's data center campus at Elliot and Sossaman Roads in Mesa.
Questions people ask about Google's Mesa data center
How much is Google's Mesa data center?
The Mesa City Council approved a $1 billion development plan for the campus in July 2019, and the city deal asks Google to spend at least $1 billion by 2029. It is a planned total, not one contract. The City of Mesa's building permits on the campus add up to about $306.5 million, the sum of Mesa permit values.
Who is building Google's data center in Mesa?
JE Dunn Construction is the general contractor on the data center buildings, partly as a joint venture with Haydon Building Corp. Caliente Construction holds the permits for the RedHawk HUB office buildings. 15 firms are named on the campus, listed above.
Where is Google's Mesa data center?
It is at 7232 E Elliot Rd, at the northwest corner of Elliot and Sossaman Roads in Mesa, Arizona 85212, in Maricopa County. Some records use 3164 S Sossaman Rd.
How many buildings does Google's Mesa campus have?
Three data center buildings so far, plus two RedHawk HUB office buildings and on-site substations. Buildings 1 and 2 are finished, and Building 3 is under construction.
Is Google's Mesa data center open?
Building 1 got its certificate of occupancy on Aug. 8, 2025, and Building 2 on Sept. 29, 2026. We found no Google statement on which halls are running.
What is the biggest permit on Google's Mesa campus?
Building 3's data hall: a 285,282 sq ft building, permitted for $78,386,935 on June 18, 2026, with JE Dunn Construction as the contractor. With its $36.8 million foundations permit, Building 3 alone is $115.1 million.
Who supplies power to Google's Mesa data center?
Salt River Project (SRP) is the power utility. SRP pulled underground cable in conduit the campus put in, under a county permit issued March 19, 2025, and JE Dunn holds a $3 million permit for a new private substation, issued Aug. 3, 2026.
Who owns the land at Google's Mesa data center?
County records list Stone Application LLC as the owner. Google is not the applicant on the City of Mesa's building permits; the contractors apply for them. A Google sign permit and a Google Mesa kitchen permit tie the address to Google.
What is the newest permit on Google's Mesa campus?
A temporary traffic control permit at the site, issued Nov. 5, 2026. The newest building permits, issued Oct. 14, 2026, are Teklus Construction's $1,989,000 site entrance work and Climatec's fire alarm for a temporary dining tent.
How do suppliers get work on Google's Mesa data center?
Call the firms already on the job. Each firm on the list has its main office line and website, so you can ask for the team on Google's Mesa campus at Elliot and Sossaman Roads.
What happens next on Google's Mesa data center?
Building 3's data hall is under construction, and the site entrance is being widened. The city deal asks Google to reach $1 billion of spending by 2029. We'll update this page when a new permit or firm appears.
How we built this list
We read every City of Mesa building permit at 7232 E Elliot Rd and the campus's Sossaman Rd addresses in the city's open permit data on Nov. 19, 2026, plus the city's traffic control records and Maricopa County's water, sewer, flood control and health permits, and news on the city council's 2019 vote and the 2023 groundbreaking. We kept each firm a public record ties to this campus. The $306.5 million is the sum of the stated values on 35 Mesa permit records from 2023 to 2026; permit values cover building work, not servers or equipment. Left out: the firm that built Google's first private substation, because the city record lists a license class instead of a firm name; a 2022 entrance permit for the utility's work before Google's construction; the kitchen food-service operators; a small engineering firm on construction trailer power we could not verify; Google's land company; city departments; and a tiny fire alarm job whose permit no longer shows in the city's data. Phones are each firm's own office line. Teklus' only phone came from a permit record, so we list its website; Faith Technologies and Amplified Wireless publish no main line we could verify; FPS Civil's site shows no phone today, so we list its website; Climatec's is its toll-free main line, and SRP's is its headquarters main line. First published Nov. 19, 2026. We'll update this page when a new permit, filing or firm appears.
Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.