What's the way into the Lincoln Center construction job at Damrosch Park?
Lincoln Center runs The Baron Theater through a construction manager, Turner Construction. We found no public bid date for the job. City bid notices and award lists show no solicitation for it.
Turner's subcontractor page is the documented door. The page sends firms to an online prequalification, and it names no project. Prequalifying puts a firm in Turner's system, and it isn't an invitation to this job.
City permits are the other way in. They name firms already on the site, so a supplier can call a firm by name. Aspro Plumbing holds the theater's underground plumbing permit, issued Oct. 14, 2026, with a declared cost of $865,063. The permit doesn't show what Aspro has already bought.
- Turner lists these items for prequalification: three supplier references, three contractor references, a Dun and Bradstreet number, safety data, a financial statement, a bank line of credit letter, a surety letter and insurance.
- Turner's New York office is at 66 Hudson Boulevard East, and its main line is (212) 229-6000.
- City records name Aspro Plumbing, Maccarone Plumbing, Sirina Fire Protection, Titan Industrial, PJP Installers and Spice Electric on this site.
- Turner renewed its street permits on West 62nd Street and Amsterdam Avenue on Nov. 3, 2026, through Dec. 31.
What's being bought for The Baron Theater at Lincoln Center?
City filings and design documents state the scopes, and they don't show who bought what. The theater's main filing declares $45,190,747 for general construction, and the city first issued it June 26, 2026. The structural filing declares $9,335,392, and the mechanical filing declares $862,421. Turner holds all three permits, so the subs behind them aren't named.
The city approved four filings for the park in July and August 2026, and no permit showed as of early November. Those filings name no contractor. That doesn't prove the work is unbought, because Turner may have bought it. The schedule in the city's environmental review puts sitework last.
Design documents filed with the city's Public Design Commission name materials. They call for Cambrian Black and Twiga (Duna) Brown granite, painted exposed steel, standing-seam metal roofing, thermally modified wood decking and clerestory glass with a bird-safe frit. The Sept. 22, 2026 deck names Kriskadecor Metals for an anodized aluminum chain shade canopy, at preliminary review.
- Park general construction: $5,892,415 declared.
- Park landscape, including paving, the Lifted Terrace and benches: $3,469,657 declared.
- Park civil and erosion control: $1,988,783 declared.
- Park stormwater detention system and area drains: $838,902 declared.
- Theater sprinkler and standpipe: $166,323 declared, in Objections since July 15, 2026, with no permit.
- Trees: About 151 after construction, with 118 replaced and 33 new.
- Serpentine precast bench: 103 seats, on the design commission's Oct. 20, 2026 agenda.
How do the ways into the Lincoln Center construction job compare?
| Way in | What it is | Best for | What you get | The limit |
|---|
| Turner's prequalification | An online application from Turner's subcontractor page | Trades new to Turner | Your firm prequalified with the construction manager | It names no project, and it isn't an invitation to this job |
| Turner's New York office | The main line, (212) 229-6000, at 66 Hudson Boulevard East | Trades already prequalified with Turner | A way to ask who's buying this job | The office page doesn't mention this job's team |
| A call to a firm on a permit | City permits name Aspro Plumbing, Maccarone Plumbing and others | Suppliers and specialty subs | A direct conversation with a firm named on the job | A permit doesn't show what's already bought |
| The design team | Consultants Lincoln Center names, such as Theatre Projects, Jaffe Holden and Delta Fountains | Reps for specified products | A way to ask about the spec | Consultants don't buy the goods, and specs may be set |
| SourceBlue | A supplier page and prequalification at SourceBlue, a Turner company | Material and equipment suppliers | Your firm in Turner's wider supply chain | Nothing shows it's buying for this job |
Who should go after the Lincoln Center job, and who shouldn't?
| Plumbing, pipe and drainage suppliers | The theater's two plumbing permits name the same firm, at $865,063 and $185,234 declared. |
|---|
| Stone, precast, glass and metal suppliers | City design documents name materials, including Cambrian Black and Twiga brown granite. |
|---|
| Trade contractors | Start with Turner's prequalification, because Turner is the construction manager. |
|---|
| Firms that need a public bid date | This isn't the job for you yet, because we found none. |
|---|
What should you do next on the Lincoln Center job?
- Prequalify with Turner if your firm isn't in its system.
- Call the firm named on a permit for your trade.
- Ask Turner's New York office who's buying your scope on this job.
- Open the full list and check each row's status and date.
Questions people ask about the Lincoln Center construction job
Who is building the Baron Theater at Lincoln Center?
Lincoln Center names Turner Construction as construction manager. Moody Nolan is the architect of record, and Weiss/Manfredi is the design architect.
Who is the general contractor on the Lincoln Center construction job?
Lincoln Center calls Turner the construction manager. City records show Turner holding the main permits, and one filing refers to the general contractor's field office trailer. We didn't find Turner's contract terms.
How do subcontractors get on the Baron Theater job?
Turner's subcontractor page sends firms to an online prequalification. It asks for references, a Dun and Bradstreet number, safety data, financial statements, a surety letter and insurance. The page names no project, so prequalifying isn't an invitation to this job.
When is the Lincoln Center construction work bidding?
We found no public bid date. City bid notices and award lists show no solicitation for this job. Private packages aren't published.
How much does the Lincoln Center West Initiative cost?
The public number is a $335 million capital campaign, which is a fundraising figure. The main city filing declares $45,190,747. That filing was first issued June 26, 2026, and the Oct. 28 record is a renewal. We didn't find the construction contract value.
What is the Damrosch Park renovation?
Lincoln Center is redeveloping the 2.4-acre park and replacing the Guggenheim Bandshell with The Baron Theater. The plans add a lawn, a fountain, tree groves and gardens on Amsterdam Avenue. The sidewalk on Amsterdam gets about 13 feet wider.
Who is doing the plumbing at the Baron Theater?
Aspro Plumbing holds the city permits for the theater's underground plumbing and its building plumbing. The declared costs are $865,063 and $185,234. Maccarone Plumbing holds a separate permit for plumbing demolition in the garage.
Who is doing the electrical at the Baron Theater?
We can't confirm the theater's electrician from public records. An electrical firm filed for general wiring on the same building on Sept. 28, 2026, but the filing doesn't name the theater. Turner would know.
Is the Baron Theater bigger than the old bandshell?
No. The new venue has about 2,000 seats, and the old setup had about 2,400. The city's environmental review says the seats sit closer to the stage.
When will the Baron Theater open?
New York State says the campus is set to open in summer 2028. NYC Parks says the park closes for about 22 months during construction and reopens in 2028.
What are the risks of chasing the Lincoln Center construction job?
We found no public bid date, and Turner's buying isn't public. Foundations and steel may already be bought. A permit shows who holds it, not what that firm still needs. Declared costs aren't contract values.
What happens after a firm prequalifies with Turner?
Turner's page names no job and lists no packages. Prequalifying puts your firm in Turner's system, and it doesn't put you on this project.
How we built this list
We read the city's live permit, filing, electrical and street records, the city's environmental review, the design commission's documents, and the state's and Lincoln Center's announcements. A row is on the list only if a source ties it to the job. We left out hiring pages and separate jobs on the same block, and we don't add mirror filings together. A row with no bid date is never marked open. First published Nov. 4, 2026. We'll update this page when a new permit, firm or bid date appears.

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.
Sources, checked Nov. 4, 2026- New York Governor's Office, May 11, 2026
- Lincoln Center, May 11, 2026
- NYC Parks, Lincoln Center West Project
- Environmental review, Chapter 1
- Environmental review, Chapter 3
- Environmental review, Chapter 10
- NYC DOB, Approved Permits, M01270545-S8
- NYC DOB, Approved Permits, M01270545-I1
- NYC DOB, Job Filings, M01299046-S6
- NYC DOB, Electrical Filings, M01466488
- NYC DOT, Street Construction Permits
- NYC DOB, After Hour Variance Permits
- Public Design Commission, Sept. 22, 2026, canopy and vent
- Public Design Commission, Sept. 22, 2026, serpentine bench
- Public Design Commission, Jan. 20, 2026
- Public Design Commission, Aug. 18, 2025
- City Record, Design Commission agenda, Oct. 20, 2026
- Turner, Subcontractors
- Turner, New York
- SourceBlue, Suppliers
- SourceBlue, Contact
- Delta Fountains
- Kriskadecor
- Theatre Projects
- Jaffe Holden
- B&G Electrical Contractors of New York
- Weiss/Manfredi