Who's building Mass General's new towers in Boston

Boston's Mass General opens the garage under its nearly $2 billion Ragon Building this month, a year before the first tower takes patients.

By Porter Stanley. Updated .

Mass General Brigham is building the Phillip and Susan Ragon Building, two new patient towers over a garage at 265-285 Cambridge Street in Boston, for Massachusetts General Hospital. The cost is nearly $2 billion, per a Nov. 12, 2026 news report. Boston's 62 building permits on the site add up to about $2.0 billion, the sum. The garage is set to open later this month, the first tower takes patients in 2027 and the second in 2030. Mass General Brigham's schedule for late November 2026 lists building demolition on the Parkman site for the second tower. The builder is a joint venture of Turner Construction and Walsh Brothers. 13 firms are named on the job; the list below has all 13.

Nearly $2BProject cost, as reported Nov. 12, 2026
$2.0BBoston's 62 permits on the site (the sum)
482Private patient rooms in two towers
13Firms named on the job

Get all 13 firms and who to call

Each one with what it does on the job and its main office line. Free: your email sets up your free account.

We send the list to this address, so use one you check. We never share it.

Get all 13 firms and who to call

Each one with what it does on the job and its main office line. Free: your email sets up your free account.

We send the list to this address, so use one you check. We never share it.

Who are the 13 firms on Mass General's Ragon Building?

We list the 13 firms named on Mass General's Ragon Building in Boston, one row each, strongest tie first, with what each one does on the job and where its name comes from.

1Latest recordNov 13, 2026

Turner Construction Company

General contractor in the Turner-Walsh joint venture: digging the six-level garage while the first tower rose, now finishing the tower and starting Phase 2 on Mass General's Ragon Building in Boston, MA

Massachusetts General Hospital Phillip and Susan Ragon Building (Cambridge Street Project), 265-285 Cambridge St, Boston, MA

Joint venture builder of the whole job; Boston's 62 permits on the site add up to about $2.0 billion, for the whole team, not one firm's share

Work: General contractor in the Turner-Walsh joint venture: digging the six-level garage while the first tower rose, now finishing the tower and starting Phase 2

Who to call: Turner Construction Company
Turner Construction Boston office line
(Boston, MA)
(617) 247-6400

The opportunity: Walsh Brothers' project page says the building is under construction by Walsh Brothers and Turner Construction operating as a joint venture. Mass General Brigham's two-week look-ahead for Nov. 16-29, 2026 lists the work of Turner-Walsh, including the Parkman site demolition for Phase 2. The joint venture had topped out the first tower by February 2025, and Turner and engineer BR+A designed the building's exhaust-air heat recovery system together.

2Latest recordNov 13, 2026

Walsh Brothers, Inc.

General contractor in the Turner-Walsh joint venture; its vice president of construction services filed the two biggest building permits on Mass General's Ragon Building in Boston, MA

Massachusetts General Hospital Phillip and Susan Ragon Building (Cambridge Street Project), 265-285 Cambridge St, Boston, MA

Building permits ERT1336882 ($555,572,900, Oct. 21, 2022, the new high-rise) and A1530627 ($1,308,023,100, Nov. 22, 2023, Phase 1 fit-out and all of Phase 2), for the whole joint venture

Work: General contractor in the Turner-Walsh joint venture; its vice president of construction services filed the two biggest building permits

Who to call: Walsh Brothers, Inc.
Walsh Brothers office line
(617) 878-4800

The opportunity: Walsh Brothers' own project page: 'Currently under construction by Walsh Brothers and Turner Construction operating as a joint venture.' The applicant on Boston's two biggest permits at 265-285 Cambridge St is James Lyons, a Walsh Brothers vice president. The look-ahead for Nov. 16-29, 2026 lists Turner-Walsh work in the tower and on Phase 2.

3Latest recordApr 25, 2024

Gaston Electrical Co. (EMCOR)

Electrical contractor for the podium, levels LL2 and 1 through 5, and the Bulfinch Lawn site lighting on Mass General's Ragon Building in Boston, MA

Massachusetts General Hospital Phillip and Susan Ragon Building (Cambridge Street Project), 265-285 Cambridge St, Boston, MA

Electrical permit E1595648, $17,518,728, Apr. 25, 2024 (podium fit-out); E1583708, $347,600 (site lighting)

Work: Electrical contractor for the podium, levels LL2 and 1 through 5, and the Bulfinch Lawn site lighting

Who to call: Gaston Electrical Co. (EMCOR)
Gaston Electrical office line
(781) 255-8881

The opportunity: Gaston's own portfolio lists the Mass General Hospital / Phillip and Susan Ragon Building Project, core and shell, for client Turner & Walsh. Boston permit E1595648: 'Fit-out of podium portion of MGH Ragon Building. Levels LL2 and 1 through 5.' The applicant is Brian Jasinski, a Gaston project executive.

What is Mass General building on Cambridge Street in Boston?

Massachusetts General Hospital, part of Mass General Brigham, is building the Phillip and Susan Ragon Building at 265-285 Cambridge Street in Boston's West End. It has two inpatient towers: the Herb Chambers Tower for cancer care and the New Balance Foundation Tower for heart care.

The towers sit on a 5-level podium over 6 levels underground with 864 parking spaces. Mass General Brigham says the building holds 482 private rooms and about 1.05 million sq ft, and it expects about 1,000 new jobs. Phase 1 alone used 10,500 tons of steel.

How much does the Ragon Building cost?

A Nov. 12, 2026 news report put the cost at nearly $2 billion. The state's Department of Public Health approved the project in part on May 4, 2022, when it was put at about $1.9 billion.

Boston's 62 building permits on the site declare $2,004,933,279 in all, the sum. Some are amendments that may overlap, so it is a rough total. The biggest is $1,308,023,100 (Nov. 22, 2023) to fit out Phase 1 and build all of Phase 2. The permit to erect the high-rise was $555,572,900 (Oct. 21, 2022).

In May 2026, Mass General Brigham secured $865.5 million in tax-exempt bonds through MassDevelopment for the building.

Was there a fight over the Ragon Building?

Yes, in 2022. The state approved the project only in part and turned down the 94 new beds Mass General asked for, after the state's Health Policy Commission warned it could drive up health care spending. A later amendment approved the 94 beds, kept in the hospital's existing space rather than added to the new building.

How far along is the Ragon Building?

The Turner-Walsh team had topped out the first tower by February 2025. To save about a year, it dug the six garage levels while the tower rose above them, on a job calling for more than 30,000 truckloads of soil to be hauled out. Crews worked 18 hours a day on weekdays and 12 on weekends in April 2025.

Per a Nov. 12, 2026 news report, the garage opens later this month, a year before the first patients. The first tower is set to finish in 2027 and the second in 2030.

Phase 2 has started. On Aug. 20, 2026, Boston issued permits to take down 275 Cambridge Street ($2.44 million) and Lawrence House at 10 North Grove Street ($435,000). Mass General Brigham's look-ahead for Nov. 16-29, 2026 lists building demolition on the Parkman site, plus elevator work, mechanical, electrical and plumbing deliveries and drywall in the tower.

Who is building the Ragon Building?

Turner Construction and Walsh Brothers are building it as a joint venture, Turner-Walsh. A Walsh Brothers vice president filed the two biggest building permits. Leggat McCall Properties manages the job for the hospital.

NBBJ is the architect. BR+A is the mechanical, electrical, plumbing and fire protection engineer, McNamara Salvia the structural engineer, VHB the civil engineer and Reed Hilderbrand the landscape architect.

Which trade firms are on the Ragon Building?

Boston's permits on the site include 7 electrical permits worth $93.6 million, 2 plumbing permits worth $31.0 million, 40 low voltage permits worth $13.9 million and a $2.15 million fire alarm permit, our sums. The biggest electrical permit is $55 million for the tower's core and shell and inpatient floors 8 to 14.

Gaston Electrical holds the $17.5 million podium electrical permit. J.C. Cannistraro holds the $10.7 million core and shell plumbing permit. Walters Group made the 10,500 tons of Phase 1 steel, with BOSS Steel on erection, and New England Lab is supplying the lab furniture. 13 firms in all are on the list below.

Who Mass General Brigham hired before

Mass General Brigham keeps going back to the same Boston team. Turner built MGH's last big inpatient tower, the Lunder Building, with Leggat McCall as the owner's project manager, and Walsh Brothers built its Spaulding rehab hospital.

  • Turner Construction: builder on MGH Lunder Building, a 516,000 sq ft inpatient tower, Boston, MA, 2011. Also on this job.
  • Leggat McCall Properties: owner's project manager on MGH Lunder Building, Boston, MA, 2011. Also on this job.
  • Walsh Brothers: builder on Spaulding Rehabilitation Hospital, Charlestown Navy Yard (Partners HealthCare, now Mass General Brigham), Boston, MA, 2011-2013. Also on this job.
  • Suffolk Construction: construction manager on Brigham and Women's Hale Building for Transformative Medicine (design firm NBBJ), Boston, MA, 2016.

These are earlier or other jobs for the same owner. They are not counted in the 13 firms on this job.

How do the ways into the Ragon Building compare?

Way inWhat it isBest forWhat you getThe limit
The firms on the jobA call to the firm's office, asking for the team on Mass General's Ragon BuildingEvery supplier, distributor and sales repA conversation with a firm already working on the jobStart with the firms whose trade matches what you sell

Who should go after Mass General's Ragon Building?

Electrical and low voltage distributorsGaston Electrical on the podium, on a job where Boston's 7 electrical permits add up to about $93.6 million and 40 low voltage permits about $13.9 million (our sums).
Plumbing, HVAC and mechanical repsJ.C. Cannistraro on the core and shell plumbing, and the BR+A heat recovery design, with Phase 2's fit-out still ahead.
Steel, concrete and finish suppliersThe Turner-Walsh team on Phase 2, now starting with demolition on the Parkman site; Walters Group and BOSS Steel on the Phase 1 steel.

What should you do next on the Ragon Building?

  1. Pick the firms whose work matches what you sell, and call them this week.
  2. Ask for the team on Mass General's Ragon Building on Cambridge Street in Boston.
  3. Watch for Phase 2 permits on the Parkman site, where the second tower goes up next.

Questions people ask about the Ragon Building

How much does Mass General's Ragon Building cost?

Nearly $2 billion, per a Nov. 12, 2026 news report. Boston's 62 building permits on the site add up to about $2.0 billion, the sum. The project was put at about $1.9 billion when the state approved it in part in 2022.

Who is building the Ragon Building?

Turner-Walsh, a joint venture of Turner Construction and Walsh Brothers. Leggat McCall Properties manages the job for Massachusetts General Hospital. 13 firms are named on the job, listed above.

When does the Ragon Building open?

The garage is set to open in late November 2026. The first tower is set to take patients in 2027 and the second tower opens in 2030.

How big is the Ragon Building?

Two towers with 482 private rooms, about 1.05 million sq ft, over a 5-level podium and 6 levels underground with 864 parking spaces. Phase 1 used 10,500 tons of steel.

What is happening on the Ragon Building now?

Mass General Brigham's look-ahead for Nov. 16-29, 2026 lists demolition on the Parkman site for Phase 2, and elevator, mechanical, electrical, plumbing and drywall work in the first tower.

Who designed the Ragon Building?

NBBJ is the architect. BR+A is the mechanical, electrical, plumbing and fire protection engineer, McNamara Salvia the structural engineer, VHB the civil engineer and Reed Hilderbrand the landscape architect.

Who is the electrical contractor on the Ragon Building?

Gaston Electrical holds the $17,518,728 permit for the podium, levels LL2 and 1 to 5. Boston's 7 electrical permits on the site add up to about $93.6 million, the sum.

How can subcontractors get on the Ragon Building?

Call the firms already on the job, starting with the Turner-Walsh joint venture for Phase 2, which has just started. Trade firms like Gaston Electrical and J.C. Cannistraro buy for their own scopes.

Why did the state cut beds from the Ragon Building?

In 2022 the state approved the project in part and turned down 94 new beds, after the Health Policy Commission warned it could drive up health care spending. A later amendment approved the 94 beds, kept in the hospital's existing space.

What happens next on the Ragon Building?

The garage opens first, then the first tower in 2027. Phase 2 demolition on the Parkman site is under way for the second tower, due in 2030. We'll update this page when a new permit or firm appears.

How we built this list

We read the City of Boston's approved building permits for 265-285 Cambridge St (62 permits), Mass General Brigham's Ragon Building page and its Nov. 16-29, 2026 look-ahead, the state's 2022 approval, the firms' own pages, a national design award entry and news reports, all on Nov. 23, 2026. We kept each firm a public record names on this project. Boston's permits name a person, not a firm, as applicant; we name a firm from a permit only when its own page or a news report ties it to this building. Contract and permit values for the joint venture are for the whole team, not one firm's share. The $2.0 billion permit total is the sum of declared values, and amendments may overlap. Leggat McCall works for the owner as project manager, not as a builder; we list it because it is a paid role. Left out: the hospital and Mass General Brigham, donors, the bond issuer, unions, state and city agencies, and permit filers whose firm we could not confirm from a public page. Phones are each firm's own line from its own site; Walters Group and BOSS Steel are Ontario lines, and New England Lab's is a toll-free line. First published Nov. 23, 2026. We'll update this page when a new permit, filing or firm appears.

Porter Stanley

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.

Sources, checked Nov. 23, 2026
  1. Boston Business Journal via NBC Boston: Mass General to open first phase of $2B construction project (Nov. 12, 2026)
  2. Mass General Brigham: two-week look-ahead, Nov. 16-29, 2026 (updated Nov. 13, 2026)
  3. City of Boston: approved building permits, 265-285 Cambridge St (read Nov. 23, 2026)
  4. Mass General Brigham: the Ragon Building
  5. New England Council: Mass General Brigham secures $865.5 million for new patient care complex (May 5, 2026)
  6. Massachusetts DPH: Determination of Need staff report, Mass General Brigham (2022)
  7. Healthcare Dive: Mass General Brigham's $2B expansion (2022)
  8. Banker & Tradesman: More than Meets the Eye at MGH Building Project (April 7, 2025)
  9. Turner: building health care facilities for a changing climate (Feb. 18, 2025)
  10. Walsh Brothers: Phillip and Susan Ragon Building at MGH
  11. AIA: Massachusetts General Hospital Phillip and Susan Ragon Building award entry
  12. Walters Group: MGH Phillip and Susan Ragon Building Project Phase 1
  13. Gaston Electrical: Mass General Hospital Phillip and Susan Ragon Building Project
  14. Mass Plumbers: Cannistraro in it for the long haul at MGH (March 16, 2023)
  15. New England Lab: Recently Awarded Project: Mass General Hospital- Cambridge Street (May 8, 2025)
  16. Leggat McCall Properties: MGH Cambridge Street Project
  17. Reed Hilderbrand: MGH Susan and Philip Ragon Building
  18. Mass General Brigham: MGH receives $100 million gift from New Balance
  19. Mass General: MGH receives transformational gift from Herb Chambers
  20. Turner: MGH Lunder Building
  21. Leggat McCall: MGH Lunder Building
  22. NEREJ: Walsh Brothers celebrates topping out of Spaulding Rehab Hospital (2011-06-16)
  23. Health Facilities Management, 2016-10-17

More project reports

All project reports
Get all 13 firms, free

All 13 firms on Mass General's Ragon Building

Enter your email and we will send it to you.

We send the list to this address, so use one you check. We never share it.