Where does Micron's money in Boise go?
ID1 is Micron's new memory fab at its Boise headquarters. When construction began in October 2023 Micron planned about $15 billion through the end of the decade; in March 2026 a Micron spokesperson put each of its two Idaho fabs at $25 billion over the next two decades. Micron says it will spend $13.0 billion with Idaho businesses over the project's life. Most of a fab's cost is the chip-making equipment inside (roughly 70 to 80 percent, by Construction Physics' estimate); the building work is what the city's permits show. Boise's live building permits for ID1 state $3.32 billion so far.
Each Boise permit splits its value by trade. Across the ID1 permits that is $418 million of electrical work, $272 million mechanical, $149 million plumbing and $65 million fire sprinklers and alarms. The rest, about $2.4 billion, is the frame, concrete, site work and scopes a permit does not split, led by $707 million for the fab's precast concrete and structural steel. Because some permits do not split their value, the trade figures are floors.
Which firms are on the permits?
We read every City of Boise building record at Micron's address since October 2022 and kept the live ones that name the new fab. They name 42 firms: 22 building and site firms, 10 electrical, 14 mechanical and plumbing, and 4 fire protection firms (some do more than one kind of work).
Hoffman Construction holds the fab's biggest permits, from the foundations to the frame and the mechanical, electrical and plumbing work; Engineered Structures (ESI) holds the administration building, garage and water buildings, and Air Liquide the bulk gas yard. Quality Electric is on the most electrical permits, YMC on the most mechanical and plumbing, and North Star Fire Protection on the most fire permits.
How do the ways into Micron's Boise fab compare?
| Way in | What it is | Best for | What you get | The limit |
|---|
| The firms on the permits | A call to the firm's office, asking for the Micron Boise team | Every supplier, distributor and sales rep | A conversation with a firm already working on the fab | Start with the firms with the newest permits |
Who should go after Micron's Boise fab?
| Electrical distributors and gear reps | The permits state about $420 million of electrical work, with 10 electrical firms named. |
|---|
| HVAC, plumbing and process pipe reps | About $420 million of mechanical and plumbing work, with 14 firms named. |
|---|
| Concrete, steel and building material reps | 22 building and site firms, and $707 million on one permit for the fab's concrete and steel frame. |
|---|
What should you do next on Micron Boise?
- Pick the firms whose permits match what you sell, and call them this week.
- Ask for the team on Micron's ID1 fab in Boise.
Questions people ask about Micron's Boise fab
How much is Micron's Boise fab?
A Micron spokesperson put each of Micron's two Idaho fabs at $25 billion over the next two decades (March 2026); when construction began in October 2023, Micron planned about $15 billion through the end of the decade. Micron says it will spend $13.0 billion with Idaho businesses over the project's life.
What is the biggest Micron Boise permit?
$707,490,932 for the ID1 fab's precast concrete and structural steel, issued May 17, 2024, with Hoffman Construction Company of America as contractor.
Who is building Micron's Boise fab?
Hoffman Construction holds the biggest ID1 permits. In all, the live permits name 42 firms, including Engineered Structures, Air Liquide, Quality Electric, YMC and North Star Fire Protection. The full list is above.
How we built this list
We searched the City of Boise's Citizen Access building records at 8000 S Federal Way in 60-day windows from January 2022 and read every record page from October 2022 on: 1,660 records, on Nov. 12, 2026. We kept the records whose own description names the new fab (ID1, Project Triton or the fab expansion) and are live (issued; not withdrawn, expired, void or still in review): 319. The $3.32 billion is the sum of the 149 live ID1 building permits' stated values; trade permits are not added, because their work sits inside the buildings'. Two permits that repeat another permit's value to the dollar are counted once, and one containment-curb permit whose stated value ($937 million) does not fit its scope is left out; the B102 HPM permit is counted at the city's High Impact layer figure ($311 million), because its record now repeats another permit's figures. The trade figures are the permits' own Electrical, Mechanical, Plumbing, Fire Sprinkler and Fire Alarm values. Firms are the contractors named on each permit; trailer lessors and Micron itself are left out, and spellings of one firm are merged. Phones come from each firm's own website; where only a registration or a listing gave one, the row says so. First published Nov. 12, 2026. We'll update this page as Boise issues new permits on Micron's fab.

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.