What's due Dec. 3 on the Missions ballpark?
AECOM Hunt's public plan room posted the listing on Nov. 3, 2026: "AECOM Hunt | Joeris (Joint Venture) has been awarded preconstruction services and is now inviting interested trade partners to bid on the construction of the San Antonio Missions New Downtown Ballpark. Bids are due December 3, 2026, at 2:00 PM."
The listing's own due-date field, and all 55 of its package rows, read Dec. 8, 2026 at 2:00 PM Central. We couldn't find an addendum or notice that settles it, so plan on Dec. 3, the earlier date, and check the plan room again before you bid.
The builder wants its bid form filled out in BuildingConnected for each package, with a letterhead proposal uploaded there. Bids must hold for 60 days, and the joint venture carries escalation past that. Site logistics and parking details come later, and so does a detailed construction schedule.
What are the 55 trade packages on the Missions ballpark?
The plan room lists every package by number. Here they are by trade family, in the plan room's own names.
- Structure: Turnkey Concrete, Precast Concrete, Masonry, Structural & Miscellaneous Steel, Decorative Railing, Ornamental Metals.
- Envelope: Waterproofing / Sealants, Metal Panels, Roofing, Spray Insulation & Fireproofing, Glass & Glazing.
- Interiors: Millwork, Doors, Frames, & Hardware, Overhead Doors, Drywall & Ceilings, Lath & Plaster, Countertops, Flooring, Fluid Applied Flooring, Concrete Floor Finishing, Painting.
- Specialties: Specialties, Signage, Operable Partitions, Shade Canopies, Building Maintenance Equipment.
- Ballpark equipment: Scoreboards, Seating, Athletic Equipment, Playground Construction, Theater / Stage Equipment, Food Service Equipment, Commercial Laundry Equipment, Residential Appliances, Hydrotherapy.
- MEP and fire: Vertical Transportation, Fire Protection, Plumbing, Mechanical.
- Electrical and systems: Electrical & Fire Alarm, Light Fixtures, Sports Lighting, Electrical Equipment, Fire Alarm System, Structured Cabling, Audio Visual, Security.
- Site: Earthwork, Earth Retention Systems, Site Paving, Site Fencing, Retaining Walls, Athletic Field, Landscape, Site Utilities.
Every package shows an expected start of Jan. 31, 2027, no job walk and no files until you join. No estimate or bidder list is posted for any of them.
Why does the lighting matter on this job?
Lighting is often bought through the electrical sub. Here the builder split it out: Light Fixtures (26.1000.00) and Sports Lighting (26.2000.00) are packages of their own, apart from Electrical & Fire Alarm (26.0000.00) and Electrical Equipment (26.2200.00).
So a lighting supplier, agency or contractor can put its own number in front of the builder. The listing doesn't say whether the fixture package is supply-only or supply-and-install, so read the package's files once you join.
Populous's renderings show light towers ringing the bowl, lit canopies at the street and park entries, and lanterns along the kept Sunshine Laundry facade in the outfield. KSAT reported the ballpark is also expected to host college and high school games.
How big is the Missions ballpark, and when does it open?
City documents give the ballpark 4,500 fixed seats and a capacity of 7,500, TPR reported, and it replaces the 32-year-old Nelson Wolff Stadium on the West Side. The price has been $160 million since 2024; Ballpark Digest reported in January 2026 that $126 million of it is for construction and that the team pays any overruns.
The San Pedro Creek Development Authority owns the ballpark. The team's owner, Designated Bidders, pledged $34 million, Bexar County lent the authority $10 million in April 2026, and tax revenue from the private development around the ballpark backs the rest, TPR and KSAT reported.
The opening moved from 2028 to April 2029. KSAT reported in July 2026 that construction was pushed to the first quarter of 2027, citing "ongoing challenges with construction, procurement, labor market conditions and securing full financing commitments." The builder's listing puts substantial completion in January 2029.
What else is planned around the Missions ballpark?
Weston Urban's three private projects won conceptual design approval with the ballpark on Apr. 2, 2026, KSAT reported: a 27-story, 410-unit tower with a garage at 309 W Travis St, The Yard Residences (14 stories, 271 units and a 389-space, six-story garage) and The Yard Hotel (eight stories, about 160 rooms). Weston Urban said it was still securing financing, and final approval is still needed.
San Antonio ISD sold the ballpark's last 2.3 acres off Camaron Street, Fox Tech High School's parking lot, and took a new parking garage and land for a new school in the deal, TPR reported.
ATI's San Antonio records hold one filing that names the ballpark so far: a tree affidavit for the San Antonio Missions Ballpark plat at 526 Camaron, issued Nov. 13, 2025.
How do the ways into the Missions ballpark compare?
| Way in | What it is | Best for | What you get | The limit |
|---|
| The builder's Dec. 3 bid round | Bid your trade's package on AECOM Hunt's public plan room | Subcontractors in any of the 55 packages | A trade contract, awarded in January 2027 | The page says Dec. 3; its package fields say Dec. 8 |
| Bid the lighting yourself | Light fixtures and sports lighting, each their own package | Lighting suppliers, agencies and contractors | Your number straight to the builder, not only through the electrical sub | The page doesn't say if the fixtures are supply-only |
| Sell to the subs who bid it | Calls to the concrete, steel, glazing, electrical and mechanical subs pricing it now | Suppliers and manufacturers' reps | Your product in a sub's number before Dec. 3 | The plan room shows no bidder list |
| The spec | A substitution request on a product Populous didn't name | Manufacturers | Your product approved as an equal | Design is at 100% construction documents |
| The blocks around it | Weston Urban's two towers and hotel, and the school district's new garage | Every trade, for later | Work on about 680 apartments, about 160 hotel rooms and three garages | No builder, no date and financing not yet secured |
Who should go after the Missions ballpark, and who shouldn't?
| Lighting suppliers, agencies and contractors | Light fixtures and sports lighting are each a package of their own, with bids due Dec. 3, 2026. |
|---|
| Electrical, low-voltage and fire alarm firms | Electrical, electrical equipment, fire alarm, structured cabling, audio visual and security are 6 more packages. |
|---|
| Ballpark specialists: seating, scoreboards, turf, shade, food service | Each has its own package in the same Dec. 3 round. |
|---|
| Firms that only sell after the trades are picked | This isn't your round yet: the builder picks its trades in January 2027, and that's when to call the winners. |
|---|
What should you do next on the Missions ballpark?
- Open the AECOM Hunt | Joeris plan room listing for the ballpark and pick your package.
- Join the package in BuildingConnected and get your bid form and letterhead proposal in by 2:00 PM on Dec. 3, 2026.
- If you supply a product, call the subs pricing your package now, and ask the builder how it takes substitution requests.
- Open the full list for every package and the planned work around the site.
Questions people ask about the Missions' new ballpark
Who is building the new Missions ballpark in San Antonio?
AECOM Hunt and Joeris General Contractors, as a joint venture. Their public plan room says the joint venture "has been awarded preconstruction services" and is inviting trade partners to bid the ballpark's construction. We found no news story naming the builder.
When are bids due on the Missions ballpark?
The plan room's description says "Bids are due December 3, 2026, at 2:00 PM." The listing's due-date field and every one of its 55 trade packages read Dec. 8, 2026, 2:00 PM Central. Plan on Dec. 3, the earlier date, and confirm in the plan room.
How many trade packages are on the Missions ballpark?
55, from turnkey concrete and structural steel to scoreboards, seating, sports lighting, the athletic field and site utilities. The plan room posts no estimate or bidder list for any of them.
How can a subcontractor bid the Missions ballpark?
Join the package for your trade on AECOM Hunt's public BuildingConnected plan room, which opens to "interested trade partners". The builder asks for its bid form in BuildingConnected and encourages a letterhead proposal uploaded there. Bids stay valid for 60 days.
How much will the new Missions ballpark cost?
$160 million, the figure the city, county and team have used since 2024. Ballpark Digest reported in January 2026 that $126 million of it goes to ballpark construction, and that the team covers any overruns.
How big is the new Missions ballpark?
City documents give it 4,500 fixed seats and a capacity of 7,500, TPR reported. TPR reported in April 2026 that it will seat 4,500 "with nearly an equal number of fans in standing or lounging areas."
Where is the new Missions ballpark?
On the west edge of downtown San Antonio, at North Flores, Camaron and Kingsbury streets along San Pedro Creek, near Fox Tech High School, in Bexar County.
When will the new Missions ballpark open?
Opening day is expected in April 2029, a year later than first planned. The builder's listing puts substantial completion in January 2029, and construction was pushed to the first quarter of 2027.
Who designed the new Missions ballpark?
Populous, which TPR reported has designed more than 75 major and minor league ballparks. The builder's listing is titled "100% CD Bid for Award", so the construction documents are complete.
Who owns the new Missions ballpark?
The San Pedro Creek Development Authority, which TPR reported owns the ballpark and will issue a revenue bond for it. The team's owner, Designated Bidders, pledged $34 million, and Weston Urban is developing the district around it.
When does the builder pick its trade contractors?
The listing says "Contractor selection shall take place in January of 2027". Each package's expected start is Jan. 31, 2027.
How we built this list
We read AECOM Hunt's public plan room listing for the ballpark (its description, the 55 package rows and the list page), Joeris's own plan room and trade partner page, Populous's March 2026 rendering set, and coverage in TPR, KSAT, the San Antonio Report, Ballpark Digest and ENR. We also checked ATI's own San Antonio permit records: the only one naming the ballpark is a Nov. 13, 2025 tree affidavit for its plat at 526 Camaron. A row is on the list only if a record ties it to the ballpark or the site plan around it. We left every person's name, phone and email off the list. The listing's description and its package fields give different due dates (Dec. 3 and Dec. 8, 2026); we list Dec. 3. First published Nov. 10, 2026. We'll update this page when the builder settles the due date, posts an addendum or picks its trades.

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.
Sources, checked Nov. 10, 2026- AECOM Hunt | Joeris, San Antonio Missions New Downtown Ballpark, 100% CD Bid for Award (public plan room)
- AECOM Hunt, public plan room
- Joeris General Contractors, Trade Partners
- Populous, San Antonio Ballpark renderings, Mar. 23, 2026 (via the San Antonio Report)
- TPR, Bexar County makes deal to finance downtown baseball stadium, Apr. 30, 2026
- TPR, San Antonio Missions release first renderings, Mar. 27, 2026
- TPR, Public meetings continue on what's next for the Wolff, Sep. 9, 2026
- TPR, San Antonio ISD trustees approve land sale for Missions ballpark, Jul. 15, 2025
- TPR, San Antonio Missions announce architect, Apr. 17, 2025
- KSAT, San Antonio Missions release renderings of new downtown ballpark, Mar. 26, 2026
- KSAT, Missions ballpark, nearby development designs get initial approval, Apr. 2, 2026
- KSAT, City leaders react to ballpark opening delay, Jul. 31, 2026
- San Antonio Report, Missions owners unveil design plans, Mar. 2026
- Ballpark Digest, San Antonio owners refine plan for new Missions ballpark, Jan. 20, 2026
- ENR, Alamo Stadium and Convocation Center renovations, Dec. 7, 2015