What is Mutual of Omaha building in Omaha?
Mutual of Omaha built a new headquarters tower at 200 S. 14th Street in downtown Omaha. City permits call the job Project Beacon. It is 677 feet tall with 44 stories and about 800,000 sq ft, and the company says it is now the tallest building in Nebraska.
A city permit lays out the floors: floors 2 to 15 are an enclosed parking garage, floors 16 to 20 and floor 44 are amenity floors, and floors 21 to 43 are offices.
The tower stands where the W. Dale Clark Library used to be. In February 2022, the Omaha City Council voted 4-3 to lease a building at 14th and Jones to move the library, which cleared the way for the tower.
How much did the Mutual of Omaha Tower cost?
The developer puts the cost at $600 million. When the tower was announced in January 2022, the figure was about $433 million.
On March 29, 2022, the Omaha City Council unanimously approved $62.7 million in tax increment financing (TIF) for the project, after hours of debate and heated citizen opposition. Some reports give $68 million.
The 14 city permits on the tower that state a value add up to $181,108,017, the sum. The biggest is JE Dunn's first office fit-out permit at $116,144,589. That leaves out the $8,498,065 library demolition and the core and shell permit, which states no value. Each permit value is what was declared to the city for that work, not the total spend.
How far along is the Mutual of Omaha Tower?
Crews broke ground on Jan. 25, 2023. The tower topped out on March 25, 2026, when the last two steel beams went up; by then the glass was done through level 42 and all the major concrete pours were finished.
The ribbon was cut on Nov. 18, 2026. "We are a fly-to state," Gov. Pillen said at the event. Workers are set to move in from about Feb. 1, 2027, with everyone in by spring.
The inside work goes on. On Oct. 7, 2026, a $19,633,000 permit was filed for heat pumps and cooling water pipe in the office fit-out, the biggest permit filed this fall. The biggest permit on the tower is JE Dunn's first office fit-out permit, $116,144,589, filed April 3, 2024. The newest, ELC-26-06358, filed Oct. 29, 2026, is for two high zone fire pump services.
Who built the Mutual of Omaha Tower?
JE Dunn Construction is the general contractor. It holds the city's building permits, starting with a $17,127,771 footings and foundations permit filed Oct. 31, 2022, then the core and shell and the first office fit-out, $116,144,589, filed April 3, 2024.
Before that, Cox Contracting of Council Bluffs, Iowa, pulled the permit to tear down the old library on Oct. 13, 2022.
Pickard Chilton was the design architect, Kendall/Heaton Associates the architect of record for the core and shell, and HOK the interior designer. Magnusson Klemencic Associates was the structural engineer, Alvine Engineering of Omaha the mechanical, electrical and plumbing engineer, and Olsson the civil engineer. Terracon is the special inspection agency on a fit-out addendum.
Which trade firms are on the Mutual of Omaha Tower?
Continental Fire Sprinkler is named on the sprinkler permits for levels 11 to 17 ($830,242) and 18 to 22 ($764,000), and is tied to the low zone ($2,776,218) and high zone ($4,022,251) systems. The two zone permits list about 11,700 sprinkler heads.
Architectural Wall Systems built the glass skin: 420,000 sq ft of glass in 5,600 curtainwall units, made at its plant in Gretna, Nebraska, plus the garage screening and the lobby.
The heating, plumbing and most electrical permits name only a licensed tradesperson, not a firm, so those firms are not on our list. The permits show the size of that work: a $7.5 million HVAC permit with 62 air handlers and 77 exhaust fans, a $10 million permit for pipe, 3 chillers and a cooling tower, 1,675 branch circuits for the core and shell and 2,937 for the fit-out, and 454 plumbing fixtures with 8 water heaters. 11 firms in all are on the list below.
How do the ways into the Mutual of Omaha Tower compare?
| Way in | What it is | Best for | What you get | The limit |
|---|
| The firms on the job | A call to the firm's office, asking for the team on the Mutual of Omaha Tower (Project Beacon) | Every supplier, distributor and sales rep | A conversation with a firm already working on the job | Start with the firms whose trade matches what you sell |
Who should go after the Mutual of Omaha Tower?
| Fire protection and electrical reps | Continental Fire Sprinkler on the tower's sprinkler permits, and new fire pump service permits filed as late as Oct. 29, 2026. |
|---|
| Mechanical, HVAC and plumbing reps | A $19.6 million fit-out pipe permit filed Oct. 7, 2026; the heating and plumbing firms are not named on the record, so start with JE Dunn and Alvine Engineering. |
|---|
| Glass, interiors and finish suppliers | Architectural Wall Systems on the curtain wall, and HOK on the interiors while the office floors are fitted out before the 2027 move-in. |
|---|
What should you do next on the Mutual of Omaha Tower?
- Pick the firms whose work matches what you sell, and call them this week.
- Ask for the team on the Mutual of Omaha headquarters tower, Project Beacon, at 200 S. 14th Street in Omaha.
- The office fit-out is still being permitted, so ask JE Dunn who holds the heating, plumbing and electrical work.
Questions people ask about the Mutual of Omaha Tower
How much did the Mutual of Omaha Tower cost?
The developer puts the cost at $600 million, up from about $433 million when the tower was announced in January 2022. The Omaha City Council approved $62.7 million in TIF for it in March 2022.
Who built the Mutual of Omaha Tower?
JE Dunn Construction is the general contractor and holds the city building permits. Pickard Chilton designed it, Kendall/Heaton Associates is the architect of record and HOK designed the interiors. 11 firms are named on the job, listed above.
How tall is the Mutual of Omaha Tower?
It is 677 feet tall with 44 stories and about 800,000 sq ft. Mutual of Omaha says it is now the tallest building in Nebraska.
Where is the Mutual of Omaha Tower?
It is at 200 S. 14th Street in downtown Omaha, on the site of the old W. Dale Clark Library. Some city permits use 215 S. 15th Street or 1302 Farnam Street for the same site.
When did the Mutual of Omaha Tower open?
The ribbon was cut on Nov. 18, 2026. Workers are set to move in from about Feb. 1, 2027, with everyone in by spring.
What is Project Beacon in Omaha?
Project Beacon is the name on the City of Omaha's permits for the Mutual of Omaha headquarters tower.
Who made the glass on the Mutual of Omaha Tower?
Architectural Wall Systems built the curtain wall: 420,000 sq ft of glass in 5,600 units, made at its plant in Gretna, Nebraska.
Who did the fire sprinklers on the Mutual of Omaha Tower?
Continental Fire Sprinkler is named on the sprinkler permits for levels 11 to 17 ($830,242) and 18 to 22 ($764,000), and is tied to the low zone and high zone systems. The two zone permits list about 11,700 sprinkler heads.
What is the newest permit on the Mutual of Omaha Tower?
The newest is ELC-26-06358 for two high zone fire pump services, filed Oct. 29, 2026. The biggest recent one is $19,633,000 for heat pumps and cooling water pipe in the office fit-out, filed Oct. 7, 2026.
What happens next on the Mutual of Omaha Tower?
The office fit-out is still being permitted while workers get ready to move in from early 2027. We'll update this page when a new permit or firm appears.
How we built this list
We read the City of Omaha's public Accela permit pages for the tower's addresses and parcels (200 S 14 St, 215 S 15 St and 1302 Farnam St), about 30 records from October 2022 to October 2026, on Nov. 24, 2026. We also read Mutual of Omaha's releases, the developer's project page, the CTBUH Skyscraper Center record, Architectural Wall Systems' and HOK's own pages, and news reports. We kept each firm a city permit, an owner release, the CTBUH record or the firm's own page names on this tower. The $181,108,017 is the sum of the 14 tower permits that state a value, not a project cost. Left out: the owner and developer, the city, a law firm, a rendering firm, crane makers, and firms tied to the job only by a licensee's address or a supplier listing. The heating, plumbing and later electrical permits name only individual licensees, so those firms are not on the list, and individuals are never listed. Phones are each firm's own line from its own site; Kendall/Heaton (Houston), HOK (Kansas City), Pickard Chilton and Magnusson Klemencic are not Omaha offices. We found no website or verified line for Cox Contracting, and no main line on Olsson's site. First published Nov. 24, 2026. We'll update this page when a new permit or firm appears.

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.
Sources, checked Nov. 24, 2026- Mutual of Omaha: New Mutual of Omaha Tower now the tallest building in Nebraska
- Mutual of Omaha: dedicates new downtown Omaha headquarters (Nov. 20, 2026)
- Mutual of Omaha: topping out ceremony for new Mutual of Omaha tower (March 2026)
- WOWT: Mutual of Omaha cuts ribbon on new downtown headquarters (Nov. 18, 2026)
- Construction Dive: $600 million Mutual of Omaha tower breaks ground (Feb. 2, 2023)
- The Reader: TIF for Mutual of Omaha approved by the Omaha City Council (March 30, 2022)
- KFAB: Omaha City Council gives green light to library plan (Feb. 2022)
- City of Omaha Accela permit records, read Nov. 24, 2026
- Architectural Wall Systems: Mutual of Omaha project page (read Nov. 24, 2026)
- HOK: HOK designs interiors for Mutual of Omaha's new headquarters (June 17, 2024)
- CTBUH Skyscraper Center: Mutual of Omaha Headquarters (read Nov. 24, 2026)
- Lanoha Real Estate: Mutual of Omaha Headquarters project page
- MKA: release of Apr. 23, 2026