What is The Spiral?
The Spiral is Tishman Speyer's 66-story office tower at 66 Hudson Boulevard in Hudson Yards, designed by Bjarke Ingels Group and expected to cost about $3.7 billion (NY YIMBY). Landscaped terraces climb the building in a spiral, and indoor atriums connect each office floor to its terrace (6sqft).
It is about 98 percent leased: Steve Cohen's Point72 leased about 60,000 square feet, the whole 31st floor and part of the 21st, in a deal that closed at the end of 2025 (The Real Deal, March 2026), and Pfizer has its headquarters there (Pfizer).
Who gets what?
The tower is built; the work now is tenants building out their floors. The DOB permits open today state about $80 million of job costs: offices (walls, ceilings and finishes) $50.4 million, air and mechanical systems $22.1 million, plumbing $3.1 million, fire sprinklers $2.2 million and structural work $1.9 million.
JRM holds $60.0 million, $59.2 million of it on floors 57 to 65, including new convenience stairs and a commercial kitchen on 59. Primary Built holds $12.6 million for the renovation of floors 18 and 19, with a feature stair.
Which firms are on the permits?
We read the NYC Department of Buildings' DOB NOW work permits at 66 Hudson Boulevard on Nov. 14, 2026 and kept every firm holding a permit marked Permit Issued, not expired, and issued since Nov. 14, 2025: 18 firms. Job costs are counted once per job filing, since its work permits repeat it.
How do the ways into The Spiral compare?
| Way in | What it is | Best for | What you get | The limit |
|---|
| The firms on the permits | A call to the firm's office, asking for the team on The Spiral | Every supplier, distributor and sales rep | A conversation with a firm already building floors there | Start with the firms with the newest permits |
Who should go after The Spiral?
| Interior, drywall, ceiling and stair suppliers | About $50 million of office build-out on the permits, led by JRM and Primary Built. |
|---|
| HVAC and mechanical reps | About $22 million of air and mechanical work, permitted under the general contractors (JRM, Primary Built and others) and Air Ideal. |
|---|
| Plumbing and fire protection suppliers | 4 plumbing firms and 7 fire sprinkler firms hold open permits. |
|---|
What should you do next on The Spiral?
- Pick the firms whose permits match what you sell, and call them this week.
- Ask for the team on The Spiral at 66 Hudson Boulevard.
Questions people ask about The Spiral
How much did The Spiral cost?
It was expected to cost about $3.7 billion (NY YIMBY).
Does The Spiral have a terrace on every floor?
Yes. Its terraces climb the tower, and indoor atriums connect each office floor to its outdoor space (6sqft).
Who are The Spiral's tenants?
Pfizer has its headquarters there, and Steve Cohen's Point72 leased the whole 31st floor and part of the 21st (about 60,000 square feet); the tower is about 98 percent leased.
Who is building the offices at The Spiral?
JRM holds $60.0 million of open permits, mostly on floors 57-65, and Primary Built $12.6 million on floors 18-19. The full list is above.
How we built this list
We read the NYC Department of Buildings' DOB NOW work permits at 66 Hudson Boulevard (open data) on Nov. 14, 2026 and kept the firms holding a permit marked Permit Issued, not expired and issued since Nov. 14, 2025. Job costs are the estimated costs the filings state, counted once per job filing. Phones are each company's own office line. First published Nov. 14, 2026. We'll update this page as the city issues new permits at The Spiral.

Porter Stanley is the founder of American Trades Index, which tracks new commercial construction projects and who's on them.